WELL · 42-365-36491 · DISTRICT 6
Ingram 2 Unit #7
Panola County · Carthage (Cotton Valley) field · Temp Abandoned · Directional
Ingram 2 Unit #7 (API 42-365-36491) is a well in Panola County operated by Cr2 Energy LLC, completed June 21, 2007 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued January 30, 2007, permitted to 10,000 ft.
It was permitted by Conocophillips Company and has since transferred to Cr2 Energy LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Pettit, Travis Peak, Cotton Valley.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Conocophillips Company; the EWA schedule now lists a different operator.
Kemah, TX · P-5 Y, filed Jun 4, 2026 · (281) 636-2078
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | CR2 Energy LLC |
| Production reports | Tanos Exploration II, LLCthrough Aug 2020 |
| Latest permit | Conocophillips CompanyJan 30, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,000
- total depth, ft
- 1
- permits on file
- Jan 30, 2007
- last permit issued
- Jun 21, 2007
- completed
- 0
- cumulative oil, bbl
- 714K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 21, 2007
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ingram 2 Unit G-6-229389 | Carthage (Cotton Valley) | CR2 Energy LLC | 1 | 0 | 714K | Jun 2007 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Conocophillips CompanyJun 2007 → Dec 2015
- 2Tanos Exploration II, LLCJan 2016 → Aug 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 632650-99 | Drill | Conocophillips Company | Jan 29, 2007 | Jan 30, 2007 | May 14, 2007 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-229389 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 210 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| PettitPETTIT UPPER | 5,726 | -5,516 |
| PettitPETTIT LOWER | 5,901 | -5,691 |
| Travis Peak | 6,127 | -5,917 |
| Cotton Valley | 8,169 | -7,959 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,433 | 9,125 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,061 | 12.25 | 390 S |
| 5.5 | 9,411 | 8.75 | 1,218 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 17, 2007 | Jul 25, 2007 | Yes |
| 00 | Sep 12, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-36491 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-36491 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36536491, documented in the API reference.