WELL · 42-365-37127 · DISTRICT 6
LA Grone #2
Panola County · Panola (Goodland Lime) field · Injection · Vertical
La Grone #2 (API 42-365-37127) is a well in Panola County operated by Sponte Operating Inc., completed November 12, 2008 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued June 13, 2008, permitted to 3,800 ft.
It was permitted by Texas American Resources Company and has since transferred to Sponte Operating Inc. on the wellbore schedule.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit, with 641K barrels injected in the 12 months reported through November 2025.
Operator of record
Permitted by Texas American Resources Company; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Dec 4, 2025 · 45 permits on file · (281) 714-7825
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sponte Operating Inc. |
| Production reports | none |
| Latest permit | Texas American Resources CompanyJun 13, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,800
- total depth, ft
- 1
- permits on file
- Jun 13, 2008
- last permit issued
- Nov 12, 2008
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 12, 2008
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| LA Grone G-6-244902 | Panola (Goodland Lime) | Sponte Operating, Inc. | 1 | 0 | 0 | Nov 2008 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 662991-99 | Drill | Texas American Resources Company | May 27, 2008 | Jun 13, 2008 | Oct 7, 2008 | 3,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-244902 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,464 | 3,626 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 770 | 11 | 250 S |
| 5.5 | 3,806 | 7.875 | 520 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 16, 2009 | Feb 6, 2009 | — |
| 00 | Feb 12, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-37127 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-37127 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 641K
- bbl, last 12 reported months
- 2.4M
- bbl, all reported
- Nov 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000099116 | W-14 Disposal | Active | 3,000 | 1,725 | 3,450–3,700 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 641,293 · prior 12 370,147(+73%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36537127, documented in the API reference.