WELL · 42-365-37551 · DISTRICT 6

Nelson H #1H

Y

Panola County · Carthage (Haynesville Shale) field · Producing  · Horizontal

Nelson H #1H (API 42-365-37551) is a horizontal well in Panola County operated by Comstock Oil & Gas LLC, completed July 18, 2010 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued November 19, 2009, permitted to 11,600 ft.

It was permitted by Comstock Oil & Gas, LP and has since transferred to Comstock Oil & Gas LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Bossier, Haynesville, James Lime.

No lease production has been reported under this well’s leases.

Operator of record

Comstock Oil & Gas LLC

Permitted by Comstock Oil & Gas, LP; the EWA schedule now lists a different operator.

Frisco, TX · P-5 Y, filed Jun 4, 2026 · 237 permits on file · (800) 929-4884

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleComstock Oil & Gas LLC
Production reportsComstock Oil & Gas, LLCthrough Apr 2026
Latest permitComstock Oil & Gas, LPNov 19, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,600
total depth, ft
2
permits on file
Nov 19, 2009
last permit issued
Jul 18, 2010
completed
0
cumulative oil, bbl
2.89M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 18, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nelson "H" G-6-257942Carthage (Haynesville Shale)Comstock Oil & Gas, LLC102.89MJul 2010 – Jul 2026

Gas, mcf lease total

Last 12 months 36,112 · prior 12 30,652(+18%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Comstock Oil & Gas, LPJul 2010 → Aug 2019
  2. 2Comstock Oil & Gas, LLCSep 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
687382-98DrillComstock Oil & Gas, LPJul 8, 2010Nov 19, 2009Feb 19, 201011,600
687382-99DrillComstock Oil & Gas, LPNov 13, 2009Nov 19, 2009Feb 19, 201011,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-257942————

Formation tops

As filed on W-2/G-1. Subsea from 251 ft elevation.Download CSV →

FormationMD ftSubsea
BossierBOSSIER SHALE——
HaynesvilleHAYNESVILLE SHALE——
James LimeJAMES——

Perforations

Perforated and open-hole intervals.

FromToType
11,86512,126Perforated
11,86516,612Perforated
12,19012,451Perforated
12,51512,776Perforated
12,90513,101Perforated
13,16513,426Perforated
13,49013,751Perforated
13,81514,076Perforated
14,14014,402Perforated
14,46514,726Perforated
14,79015,051Perforated
15,15515,376Perforated
15,44015,701Perforated
15,76516,026Perforated
16,09016,351Perforated
16,41516,612Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,89513.5784 S
7.62510,6149.875901 S
5.516,6716.75610 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 9, 2012May 25, 2011—
00Nov 12, 2010Aug 27, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.