WELL · 42-365-37665 · DISTRICT 6
Hancock #2
Panola County · Paxton (Upper Glen Rose) field · Temp Abandoned · Vertical
Hancock #2 (API 42-365-37665) is a well in Panola County operated by CX Operating LLC, completed April 27, 2011 and listed as temp abandoned on the RRC schedule.
The RRC has issued 2 drilling permits (amended once) between 2010 and 2013, permitted to 7,000 ft.
Completion filings report 3 formation tops, including Glen Rose, James Lime, Travis Peak.
No lease production has been reported under this well’s leases.
Operator of record
Dallas, TX · P-5 Y, filed Jun 4, 2026 · 3 permits on file · (214) 563-3399
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | CX Operating LLC |
| Production reports | CX Operating LLCthrough Jun 2020 |
| Latest permit | CX Operating LLCMay 7, 2013 |
- 7,000
- total depth, ft
- 3
- permits on file
- May 7, 2013
- last permit issued
- Apr 27, 2011
- completed
- 0
- cumulative oil, bbl
- 23.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 27, 2011
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hancock G-6-262408 | Paxton (Hill) | CX Operating LLC | 1 | 0 | 0 | Feb 2011 – Jul 2026 |
| Hancock G-6-269918 | Paxton (Upper Glen Rose) | CX Operating LLC | 1 | 0 | 23.5K | Feb 2011 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1CX Operating LLCApr 2011 → Jun 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 762051-99 | Recompletion | CX Operating LLC | May 3, 2013 | May 7, 2013 | Nov 26, 2010 | 6,930 |
| 698604-98 | Drill | CX Operating LLC | Nov 12, 2010 | Sep 17, 2010 | Nov 22, 2010 | 7,000 |
| 698604-99 | Drill | CX Operating LLC | Jul 6, 2010 | Sep 17, 2010 | Nov 22, 2010 | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-262408 | — | — | — | — |
| — | — G-6-269918 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 288 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Glen Rose | 3,803 | -3,515 |
| James Lime | 5,665 | -5,377 |
| Travis Peak | 6,434 | -6,146 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,803 | 3,809 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,075 | 11 | 310 S |
| 4.5 | 6,800 | 7.875 | 725 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 5, 2013 | Jul 23, 2013 | — |
| 00 | May 2, 2013 | Dec 21, 2012 | Yes |
| 00 | Mar 1, 2012 | Aug 8, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-37665 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-37665 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36537665, documented in the API reference.