WELL · 42-365-37769 · DISTRICT 6
Frost-Tenaha Gas Unit #3H
Panola County · Carthage (Haynesville Shale) field · Producing · Horizontal
Frost-Tenaha Gas Unit #3H (API 42-365-37769) is a horizontal well in Panola County operated by Tgnr Panola LLC, completed January 22, 2012 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued June 8, 2011, permitted to 16,200 ft.
It was permitted by Classic Operating CO. LLC and has since transferred to Tgnr Panola LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Bexar, Cotton Valley, Haynesville.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Classic Operating Co. LLC; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Dec 4, 2025 · 69 permits on file · (844) 888-9549
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TGNR Panola LLC |
| Production reports | TGNR Panola LLCthrough Apr 2026 |
| Latest permit | Classic Operating Co. LLCJun 8, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 16,200
- total depth, ft
- 1
- permits on file
- Jun 8, 2011
- last permit issued
- Jan 22, 2012
- completed
- 0
- cumulative oil, bbl
- 3M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2012 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 22, 2012
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Frost-Tenaha Gas Unit G-6-263998 | Carthage (Haynesville Shale) | TGNR Panola LLC | 1 | 0 | 3M | Jan 2012 – Jul 2026 |
Gas, mcf lease total
Last 12 months 72,377 · prior 12 28,140(+157%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chevron U. S. A. Inc.Jan 2012 → Mar 2025
- 2TGNR Panola LLCMay 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 717740-99 | Drill | Classic Operating Co. LLC | Jun 3, 2011 | Jun 8, 2011 | Oct 12, 2011 | 16,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-263998 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 176 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bexar | 5,280 | -5,104 |
| Cotton Valley | 9,600 | -9,424 |
| HaynesvilleHAYNESVILLE SHALE | 10,496 | -10,320 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,000 | 15,970 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 1,020 | 18.5 | 594 S |
| 10.75 | 5,297 | 13.5 | 1,429 S |
| 5.5 | 9,376 | 6.75 | 667 S |
| 7.625 | 9,806 | 9.875 | 1,069 S |
| 5 | 16,055 | 6.75 | 667 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 27, 2012 | Feb 28, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-37769 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-37769 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.