WELL · 42-367-30462 · DISTRICT 7

Pearson W.F. #1

Plugged

Parker County · Dicey (Conglomerate) field  · Vertical

Pearson W.F. #1 (API 42-367-30462) is a plugged well in Parker County, plugged June 19, 2023, last operated by Hess Jerry Operating CO..

The RRC has issued one drilling permit, issued June 21, 1978, permitted to 6,200 ft.

It was permitted by Cayman Exploration Corp. and has since transferred to Hess Jerry Operating CO. on the wellbore schedule.

Operator of record

Hess Jerry Operating Co.

Permitted by Cayman Exploration Corp.; the EWA schedule now lists a different operator.

Muenster, TX · P-5 Y, filed Mar 4, 2026 · 146 permits on file · (940) 736-3504

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHess Jerry Operating Co.
Production reportsHess, Jerry Operating Co.through Jul 2012
Latest permitCayman Exploration Corp.Jun 21, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,200
total depth, ft
1
permits on file
Jun 21, 1978
last permit issued
Feb 20, 1977
completed
0
cumulative oil, bbl
243K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2023

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 20, 1977
Shut in
—
Plugged
Jun 19, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pearson, W.F. G-8-77472Dicey (Conglomerate)Hess, Jerry Operating Co.10243KJan 1993 – Jun 2023

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hess, Jerry Operating Co.Jan 1993 → Jul 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
26993-99DrillCayman Exploration Corp.Jun 21, 1978Jun 21, 1978—6,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-77472————

Perforations

Perforated and open-hole intervals.

FromToType
5,8895,895Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62572212.25550 S
2.3755,850——
4.55,9397.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jul 19, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36730462, documented in the API reference.