WELL · 42-367-30594 · DISTRICT 7
Lamkin C.C. #1
Parker County · Bethesda (Caddo) field · Vertical
Lamkin C.C. #1 (API 42-367-30594) is a plugged well in Parker County, plugged December 30, 2011, last operated by Arrowhead Productions LP.
The RRC has issued 2 drilling permits between 1977 and 1983, permitted to 5,300 ft.
It was permitted by Mitchell Energy Corporation and has since transferred to Arrowhead Productions LP on the wellbore schedule.
Completion filings report one formation top, including Big Saline.
Operator of record
Permitted by Mitchell Energy Corporation; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Jun 29, 2026 · 17 permits on file · (940) 567-1145
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Arrowhead Productions LP |
| Production reports | Encana Oil & Gas(usa) Inc.through Oct 2007 |
| Latest permit | Mitchell Energy CorporationDec 13, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,300
- total depth, ft
- 2
- permits on file
- Dec 13, 1983
- last permit issued
- Dec 7, 1983
- completed
- 0
- cumulative oil, bbl
- 20.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 7, 1983
- Shut in
- —
- Plugged
- Dec 30, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lamkin,c.c. G-8-108796 | Bethesda (Caddo) | Arrowhead Productions, LP | 1 | 0 | 20.8K | Jan 1993 – Dec 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Taylor, Ben J. Inc.Mar 1997 → Oct 2003
- 2Encana Oil & Gas(usa) Inc.Nov 2003 → Oct 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 223647-99 | Recompletion | Mitchell Energy Corporation | Dec 13, 1983 | Dec 13, 1983 | — | 4,944 |
| 441-99 | Drill | D/FW Oil & Gas, Inc. | Jun 10, 1977 | Jun 10, 1977 | — | 5,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-108796 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 997 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Big Saline | 4,151 | -3,154 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,665 | 3,695 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 610 | 12.25 | 430 S |
| 4.5 | 4,353 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 21, 1984 | Jan 20, 1984 | — |
| 00 | Feb 10, 1984 | Jan 20, 1984 | — |
| 00 | Jan 12, 1984 | Aug 25, 1977 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-367-30594 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-367-30594 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36730594, documented in the API reference.