WELL · 42-367-31032 · DISTRICT 7
Chenault #1
Parker County · Lazy Bend Gas (Strawn) field · Vertical
Chenault #1 (API 42-367-31032) is a plugged well in Parker County, plugged April 12, 2011, last operated by Mks Natural Gas Company.
The RRC has issued one drilling permit, issued March 14, 1978, permitted to 2,200 ft.
It was permitted by Arrowhead Energy CO. and has since transferred to Mks Natural Gas Company on the wellbore schedule.
Operator of record
Permitted by Arrowhead Energy Co.; the EWA schedule now lists a different operator.
Weatherford, TX · P-5 Y, filed May 12, 2020 · (817) 682-6651
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | MKS Natural Gas Company |
| Production reports | MKS Natural Gas Companythrough Oct 2005 |
| Latest permit | Arrowhead Energy Co.Mar 14, 1978 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,200
- total depth, ft
- 1
- permits on file
- Mar 14, 1978
- last permit issued
- Oct 18, 2005
- completed
- 0
- cumulative oil, bbl
- 23K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 18, 2005
- Shut in
- —
- Plugged
- Apr 12, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Chenault G-8-94796 | Lazy Bend Gas (Strawn) | MKS Natural Gas Company | 1 | 0 | 23K | Jan 1993 – Apr 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1JJB Operating Co.Jan 1993 → Jul 1995
- 2MKS Consulting CorporationJan 1996 → Jun 2000
- 3MKS Natural Gas CompanyOct 2005 → Oct 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 20087-99 | Drill | Arrowhead Energy Co. | Mar 14, 1978 | Mar 14, 1978 | — | 2,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-94796 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,878 | 2,035 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 2.375 | 1,844 | — | — |
| 8.625 | 1,872 | 12.25 | 1,050 S |
| 8.625 | 1,878 | 12.25 | 1,050 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 6, 2006 | Nov 14, 2005 | — |
| 00 | Jan 9, 2006 | Oct 24, 2005 | — |
| 00 | Aug 14, 2002 | Jun 19, 2002 | — |
| 00 | Jan 12, 1984 | Aug 9, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-367-31032 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-367-31032 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 4.21K
- bbl, last 12 reported months
- 29.7K
- bbl, all reported
- Mar 2006
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000090060 | H-1 Injection | Plugged May 24, 2011 | 150 | 150 | 1,878–2,035 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 4,212 · prior 12 4,480(-6%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.