WELL · 42-367-32202 · DISTRICT 7

Johnston #1

Plugged

Parker County · Meeker (Conglomerate 4800) field  · Vertical

Johnston #1 (API 42-367-32202) is a plugged well in Parker County, plugged February 8, 2023, last operated by Select Agua Libre Midstream LLC.

The RRC has issued one drilling permit, issued November 6, 1981, permitted to 5,229 ft.

It was permitted by Doc'S Tank Trucks and has since transferred to Select Agua Libre Midstream LLC on the wellbore schedule.

Operator of record

Select Agua Libre Midstream LLC

Permitted by Doc's Tank Trucks; the EWA schedule now lists a different operator.

Mustang, OK · P-5 Y, filed Jul 4, 2025 · (405) 664-0158

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSelect Agua Libre Midstream LLC
Production reportsnone
Latest permitDoc's Tank TrucksNov 6, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,229
total depth, ft
1
permits on file
Nov 6, 1981
last permit issued
Jan 21, 1986
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 21, 1986
Shut in
—
Plugged
Feb 8, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Johnston O-8-23795Meeker (Conglomerate 4800)Select Agua Libre Midstream, LLC100Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
141462-99DrillDoc's Tank TrucksDec 9, 1985Nov 6, 1981Nov 6, 19815,229

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-23795————

Perforations

Perforated and open-hole intervals.

FromToType
3,2623,265Perforated
3,2625,200Perforated
3,2913,296Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62571513.75425 S
3.53,2424.5400 S
4.55,2477.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 12, 2008Apr 26, 2007—
00Jun 25, 1986Feb 20, 1986—
00Jun 24, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
6.75M
bbl, all reported
May 2023
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000060651H-1 InjectionPlugged Apr 6, 20233,5001,6003,262–5,200

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120222023

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36732202, documented in the API reference.