WELL · 42-367-32470 · DISTRICT 7
Woody B #1
Parker County · Dicey (Conglomerate) field · Vertical
Woody B #1 (API 42-367-32470) is a plugged well in Parker County, plugged August 5, 1992, last operated by Mcmahon-Bullington Drilling CO..
The RRC has issued one drilling permit, issued March 17, 1983, permitted to 6,000 ft.
It was permitted by Txo Production Corp. and has since transferred to Mcmahon-Bullington Drilling CO. on the wellbore schedule.
Completion filings report one formation top, including Atoka.
Operator of record
McMahon-Bullington Drilling Co.
Permitted by TXO Production Corp.; the EWA schedule now lists a different operator.
Wichita Falls, TX · P-5 Y, filed May 3, 1996 · 121 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | McMahon-Bullington Drilling Co. |
| Production reports | none |
| Latest permit | TXO Production Corp.Mar 17, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,000
- total depth, ft
- 1
- permits on file
- Mar 17, 1983
- last permit issued
- Mar 4, 1986
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 4, 1986
- Shut in
- —
- Plugged
- Aug 5, 1992
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — G-8-105610 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 188790-99 | Drill | TXO Production Corp. | Mar 17, 1983 | Mar 17, 1983 | — | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-105610 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,102 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Atoka | 5,166 | -4,064 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,241 | 5,251 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 902 | 12.25 | 490 S |
| 2.375 | 5,134 | — | — |
| 4.5 | 5,384 | 7.875 | 190 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 7, 1986 | Apr 29, 1986 | — |
| 00 | Jan 12, 1984 | May 27, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-367-32470 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-367-32470 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 2.71M
- bbl, last 12 reported months
- 2.73M
- bbl, all reported
- Apr 1992
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000057621 | H-1 Injection | Plugged Aug 18, 1992 | 0 | 0 | 5,241–0 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 2,707,440 · prior 12 25,399(+10560%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36732470, documented in the API reference.