WELL · 42-367-32697 · DISTRICT 7
Williams #1
Parker County · Coffey (Middle Strawn) field · Vertical
Williams #1 (API 42-367-32697) is a plugged well in Parker County, plugged June 15, 2012, last operated by Vantage Fort Worth Energy LLC.
The RRC has issued one drilling permit, issued March 19, 1984, permitted to 5,100 ft.
It was permitted by T R M Energy CO. and has since transferred to Vantage Fort Worth Energy LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Strawn, Atoka, Congl..
Operator of record
Permitted by T R M Energy Co.; the EWA schedule now lists a different operator.
Pittsburgh, PA · P-5 Y, filed May 12, 2020 · 599 permits on file · (800) 926-1759
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Vantage Fort Worth Energy LLC |
| Production reports | Citrus Energy Corporationthrough Jun 2008 |
| Latest permit | T R M Energy Co.Mar 19, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,100
- total depth, ft
- 1
- permits on file
- Mar 19, 1984
- last permit issued
- May 4, 1984
- completed
- 0
- cumulative oil, bbl
- 104K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 4, 1984
- Shut in
- —
- Plugged
- Jun 15, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Williams G-8-111284 | Coffey (Middle Strawn) | Vantage Fort Worth Energy LLC | 1 | 0 | 104K | Jan 1993 – Jun 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Yorek Oil & GasJan 1993 → Sep 1994
- 2Yorek Oil & Gas, Inc.Oct 1994 → Jan 1996
- 3CD Consulting & Operating Co.Feb 1996 → Oct 2000
- 4MKS Consulting CorporationNov 2000 → Jul 2005
- 5MKS Natural Gas CompanyAug 2005 → Feb 2008
- 6Citrus Energy CorporationMar 2008 → Jun 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 232789-99 | Drill | T R M Energy Co. | May 29, 1984 | Mar 19, 1984 | — | 5,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-111284 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,055 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,043 | 2,053 | Perforated |
| 2,071 | 2,075 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 490 | 12.25 | 350 sx |
| 4.5 | 3,033 | 7.875 | 230 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 17, 1984 | May 29, 1984 | — |
| 00 | Jul 14, 1984 | May 29, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-367-32697 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-367-32697 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36732697, documented in the API reference.