WELL · 42-367-32724 · DISTRICT 7

Stone #2

Plugged

Parker County · Dillon (Strawn) field  · Vertical

Stone #2 (API 42-367-32724) is a plugged well in Parker County, plugged August 12, 1989, last operated by Hawkeye Oil & Gas Corporation.

The RRC has issued one drilling permit, issued May 18, 1984, permitted to 4,750 ft.

Completion filings report one formation top, including Strawn.

Operator of record

Hawkeye Oil & Gas Corporation

Fort Worth, TX · P-5 Y, filed Feb 5, 2021 · 56 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHawkeye Oil & Gas Corporation
Production reportsnone
Latest permitHawkeye Oil & Gas CorporationMay 18, 1984
4,750
total depth, ft
1
permits on file
May 18, 1984
last permit issued
Jul 20, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 20, 1984
Shut in
—
Plugged
Aug 12, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
239177-99DrillHawkeye Oil & Gas CorporationJun 11, 1984May 18, 1984Jun 9, 19844,750

Formation tops

As filed on W-2/G-1. Subsea from 10 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn2,648-2,638

Perforations

Perforated and open-hole intervals.

FromToType
2,6482,651Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.625641—500 S
4.53,766—380 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 30, 1984Aug 29, 1984Yes
00Nov 15, 1984Aug 22, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36732724, documented in the API reference.