WELL · 42-367-32767 · DISTRICT 7
Hill Sallie #1
Parker County · Meeker (Conglomerate 4000) field · Vertical
Hill Sallie #1 (API 42-367-32767) is a plugged well in Parker County, plugged May 28, 2021, last operated by Meeker And Company Inc..
The RRC has issued one drilling permit, issued July 10, 1984, permitted to 4,325 ft.
It was permitted by Dallas Production, Inc. and has since transferred to Meeker And Company Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including T. Caddo Congl., T. Caddo Conglomerate.
Operator of record
Permitted by Dallas Production, Inc.; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Feb 4, 2022 · 8 permits on file · (817) 992-4508
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Meeker and Company Inc. |
| Production reports | Meeker and Company, Inc.through Mar 2021 |
| Latest permit | Dallas Production, Inc.Jul 10, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,325
- total depth, ft
- 1
- permits on file
- Jul 10, 1984
- last permit issued
- Apr 10, 1985
- completed
- 0
- cumulative oil, bbl
- 149K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 10, 1985
- Shut in
- —
- Plugged
- May 28, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hill,sallie G-8-116304 | Meeker (Conglomerate 3850) | Meeker and Company, Inc. | 1 | 0 | 32.1K | Jan 1993 – May 2021 |
| Hill,sallie G-8-116305 | Meeker (Conglomerate 4000) | Meeker and Company, Inc. | 1 | 0 | 117K | Jan 1993 – May 2021 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Roanoke CorporationJan 1993 → Aug 1993
- 2Dallas Production, Inc.Sep 1993 → Jul 1999
- 33-R Production, Inc.Aug 1999 → Oct 2004
- 4EOG Resources, Inc.Nov 2004 → Mar 2007
- 5Meeker and Company, Inc.Nov 2012 → Mar 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 244565-99 | Drill | Dallas Production, Inc. | May 2, 1985 | Jul 10, 1984 | — | 4,325 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-116304 | — | — | — | — |
| — | — G-8-116305 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,175 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T. Caddo Congl. | 4,113 | -2,938 |
| T. Caddo Conglomerate | 4,113 | -2,938 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,138 | 4,144 | Perforated |
| 4,146 | 4,151 | Perforated |
| 4,221 | 4,231 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 534 | 12.25 | 385 S |
| 5.5 | 4,312 | 7.875 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 23, 1985 | May 7, 1985 | — |
| 00 | May 21, 1985 | May 7, 1985 | — |
| 00 | May 17, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-367-32767 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-367-32767 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36732767, documented in the API reference.