WELL · 42-367-33399 · DISTRICT 7

Hayter A. L. #1

Plugged

Parker County · Newark East (Barnett Shale) field  · Vertical

Hayter A. L. #1 (API 42-367-33399) is a plugged well in Parker County, plugged June 28, 2023, last operated by Javelin Energy Partners Mgmt LLC.

The RRC has issued 2 drilling permits (amended once) between 2001 and 2002, permitted to 5,700 ft.

It was permitted by Howell Petroleum Corporation and has since transferred to Javelin Energy Partners Mgmt LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Atoka, Big Saline, Marble Falls, Barnett.

Operator of record

Javelin Energy Partners Mgmt LLC

Permitted by Howell Petroleum Corporation; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Jan 4, 2026 · 233 permits on file · (888) 973-7780

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJavelin Energy Partners Mgmt LLC
Production reportsFDL Operating, LLCthrough Jun 2018
Latest permitHowell Petroleum CorporationSep 10, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,700
total depth, ft
3
permits on file
Sep 10, 2002
last permit issued
Jun 8, 2002
completed
0
cumulative oil, bbl
44.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2001 THROUGH Jun 2023

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 8, 2002
Shut in
—
Plugged
Jun 28, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hayter, A. L. G-13-191559Newark, East (Barnett Shale)Javelin Energy Partners Mgmt LLC1044.1KJun 2002 – Jun 2023
Hayter, A.L. G-8-186694WildcatHowell Petroleum Corporation100Oct 2001 – Jun 2002

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Howell Petroleum CorporationJul 2002 → Nov 2003
  2. 2Chief Oil & Gas LLC *Dec 2003 → Jun 2006
  3. 3Devon Energy Production Co, L.P.Jul 2006 → Oct 2011
  4. 4FDL Operating, LLCJun 2018 → Jun 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
523581-99RecompletionHowell Petroleum CorporationAug 28, 2002Sep 10, 2002Oct 10, 20015,700
513787-98DrillHowell Petroleum CorporationAug 28, 2002Sep 20, 2001—5,700
513787-99DrillHowell Petroleum CorporationSep 20, 2001Sep 20, 2001Oct 18, 20015,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-191559————
—— G-8-186694————

Formation tops

As filed on W-2/G-1. Subsea from 799 ft elevation.Download CSV →

FormationMD ftSubsea
Atoka2,726-1,927
Big Saline4,338-3,539
Marble Falls4,732-3,933
Barnett5,082-4,283

Perforations

Perforated and open-hole intervals.

FromToType
5,1035,124Perforated
5,1425,156Perforated
5,1815,194Perforated
5,2255,240Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62532612.25215 S
5.55,2607.875615 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 10, 2003Sep 6, 2002Yes
00Dec 3, 2002——
00Feb 13, 2002Jan 23, 2002Yes
00Feb 5, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36733399, documented in the API reference.