WELL · 42-367-33466 · DISTRICT 9

Goforth #1H

Y

Parker County · Newark East (Barnett Shale) field · Producing  · Horizontal

Goforth #1H (API 42-367-33466) is a horizontal well in Parker County operated by Eagleridge Operating LLC, completed March 16, 2004 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued October 22, 2003, permitted to 9,000 ft.

It was permitted by Westport Oil And Gas Company, LP and has since transferred to Eagleridge Operating LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Barnett, Ellenburger.

No lease production has been reported under this well’s leases.

Operator of record

Eagleridge Operating LLC

Permitted by Westport Oil and Gas Company, LP; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jan 4, 2026 · 129 permits on file · (855) 820-6008

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEagleridge Operating LLC
Production reportsEagleridge Operating, LLCthrough Apr 2026
Latest permitWestport Oil and Gas Company, LPOct 22, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
2
permits on file
Oct 22, 2003
last permit issued
Mar 16, 2004
completed
0
cumulative oil, bbl
1.56M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 16, 2004
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Goforth G-13-201006Newark, East (Barnett Shale)Eagleridge Operating, LLC101.56MMar 2004 – Jul 2026

Gas, mcf lease total

Last 12 months 32,359 · prior 12 48,958(-34%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Westport Oil and Gas Company, LPMar 2004 → Aug 2005
  2. 2Burlington Resources O & G Co LPSep 2005 → Dec 2010
  3. 3Premier Natural Resources Ii,llcJan 2011 → Feb 2015
  4. 4Trinity River Energy Oper, LLCMar 2015 → Jun 2017
  5. 5Eagleridge Operating, LLCJul 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
537803-98DrillWestport Oil and Gas Company, LPApr 2, 2004Oct 22, 2003Nov 24, 20039,000
537803-99DrillRichman Petroleum Corp.Oct 22, 2003Oct 22, 2003—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-201006————

Formation tops

As filed on W-2/G-1. Subsea from 814 ft elevation.Download CSV →

FormationMD ftSubsea
BarnettBARNETT SHALE6,383-5,569
Ellenburger6,720-5,906

Perforations

Perforated and open-hole intervals.

FromToType
7,6907,694Perforated
8,0428,046Perforated
8,3948,398Perforated
8,7468,751Perforated
9,1009,105Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,05512.25410 S
5.59,1838.5190 S
5.5——1,210 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 4, 2004Apr 8, 2004Yes
00May 17, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36733466, documented in the API reference.