WELL · 42-367-34146 · DISTRICT 9
Triad-Hendrix Unit #1H
Parker County · Newark East (Barnett Shale) field · Horizontal
Triad-Hendrix Unit #1H (API 42-367-34146) is a plugged horizontal well in Parker County, plugged October 20, 2021, last operated by Tree Operating LLC.
The RRC has issued one drilling permit (amended once), issued August 25, 2006, permitted to 8,000 ft.
It was permitted by Willowbend Investments, Inc. and has since transferred to Tree Operating LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Marble Falls, Barnett.
Operator of record
Permitted by Willowbend Investments, Inc.; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed Aug 4, 2025 · 1 permits on file · (214) 566-1601
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tree Operating LLC |
| Production reports | Triad Exploration, Ltd.through Jan 2008 |
| Latest permit | Willowbend Investments, Inc.Aug 25, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,000
- total depth, ft
- 2
- permits on file
- Aug 25, 2006
- last permit issued
- Nov 17, 2006
- completed
- 0
- cumulative oil, bbl
- 46K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2006 THROUGH Oct 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 17, 2006
- Shut in
- —
- Plugged
- Oct 20, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Triad-Hendrix Unit G-13-226936 | Newark, East (Barnett Shale) | Tree Operating, LLC | 1 | 0 | 46K | Nov 2006 – Oct 2021 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Willowbend Investments, Inc.Nov 2006 → Aug 2007
- 2Triad Exploration, Ltd.Sep 2007 → Jan 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 624962-98 | Drill | Willowbend Investments, Inc. | May 9, 2007 | Aug 25, 2006 | Sep 1, 2006 | 8,000 |
| 624962-99 | Drill | Willowbend Investments, Inc. | Aug 25, 2006 | Aug 25, 2006 | — | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-226936 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 836 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marble Falls | 6,170 | -5,334 |
| BarnettBARNETT SHALE | 6,570 | -5,734 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,570 | 6,875 | Perforated |
| 7,020 | 7,325 | Perforated |
| 7,470 | 7,775 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 631 | 12.25 | 250 S |
| 5.5 | 7,875 | 7.875 | 520 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 7, 2007 | Feb 12, 2007 | Yes |
| 00 | Jun 5, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-367-34146 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-367-34146 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.