WELL · 42-367-34213 · DISTRICT 9

Hasty #1H

Plugged

Parker County · Newark East (Barnett Shale) field  · Horizontal

Hasty #1H (API 42-367-34213) is a plugged horizontal well in Parker County, plugged May 13, 2021, last operated by Big Star Exploration.

The RRC has issued one drilling permit, issued October 27, 2006, permitted to 7,200 ft.

It was permitted by Shell Western E&P and has since transferred to Big Star Exploration on the wellbore schedule.

Completion filings report 6 formation tops, including Strawn, Caddo, Atoka, Bend.

Operator of record

Big Star Exploration

Permitted by Shell Western E&P; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Mar 7, 2025 · (817) 266-4246

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBig Star Exploration
Production reportsPioneer Natural Res. USA, Inc.through Apr 2013
Latest permitShell Western E&POct 27, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,200
total depth, ft
1
permits on file
Oct 27, 2006
last permit issued
Jun 26, 2007
completed
0
cumulative oil, bbl
274K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2007 THROUGH May 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 26, 2007
Shut in
—
Plugged
May 13, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hasty G-13-249205Newark, East (Barnett Shale)Big Star Exploration10274KJun 2007 – May 2021

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shell Western E&PSep 2007 → Dec 2007
  2. 2Pioneer Natural Res. USA, Inc.Jan 2008 → Apr 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
628032-99DrillShell Western E&POct 25, 2006Oct 27, 2006Nov 22, 20067,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-249205————

Formation tops

As filed on W-2/G-1. Subsea from 1,062 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn2,403-1,341
Caddo3,892-2,830
Atoka4,505-3,443
BendBEND CONGLOMERATES4,652-3,590
Marble Falls5,059-3,997
Barnett5,713-4,651

Perforations

Perforated and open-hole intervals.

FromToType
5,9658,415Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,02512.25470 S
5.58,4799.75475 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 17, 2009Nov 16, 2007Yes
00Jul 13, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36734213, documented in the API reference.