WELL · 42-371-01467 · DISTRICT 8
Shearer #2B
Pecos County · Vertical
Shearer #2B (API 42-371-01467) is a permitted well in Pecos County filed by Earnest Producing Corporation; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1998 and 2004, permitted to 4,370 ft.
Its 2 leases have reported 4.25K barrels of oil and 33.3K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Midland, TX · P-5 Y, filed May 4, 2026 · 23 permits on file · (432) 230-1919
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Earnest Producing Corporationthrough Jul 2020 |
| Latest permit | Earnest Producing CorporationJul 26, 2004 |
- 4,370
- total depth, ft
- 2
- permits on file
- Jul 26, 2004
- last permit issued
- —
- completed
- 4.25K
- cumulative oil, bbl
- 33.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Shearer G-10-168846 | Apco (Clear Fork) | Earnest Producing Corporation | 1 | 0 | 24.5K | Jan 1998 – Jul 2026 |
| Shearer O-10-320 | Apco-Warner | Earnest Producing Corporation | 1 | 4.25K | 8.82K | Jan 1993 – Nov 2005 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lawrence, C. F. & Assoc. Inc.Jan 1993 → Jul 1994
- 2Riley Production, Inc.Aug 1994 → Dec 1996
- 3Earnest Producing CorporationJan 1997 → Jul 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 545579-99 | Drill | Earnest Producing Corporation | May 11, 2004 | Jul 26, 2004 | Feb 1, 2004 | 4,370 |
| 474268-99 | Recompletion | Earnest Producing Corporation | Mar 25, 1998 | Apr 23, 1998 | Nov 15, 1997 | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-10-168846 | — | — | — | — |
| — | — O-10-320 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,203 | 3,205 | Perforated |
| 3,212 | 3,220 | Perforated |
| 3,226 | 3,228 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 300 | — | 200 S |
| 7 | 2,659 | 8.75 | 300 S |
| 7 | 2,659 | 9 | 300 S |
| 5 | 4,693 | 6.25 | 400 S |
| 5 | 4,693 | 9 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 28, 1998 | May 27, 1998 | Yes |
| 00 | Jul 14, 1998 | — | — |
| 00 | Jan 12, 1984 | Apr 8, 1971 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-371-01467 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-371-01467 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/37101467, documented in the API reference.