WELL · 42-371-05415 · DISTRICT 8

State Baldwin #1

N

Pecos County  · Vertical

State Baldwin #1 (API 42-371-05415) is a permitted well in Pecos County filed by Stanolind Operating LLC; no completion report is on file yet.

The RRC has issued 3 drilling permits between 1983 and 2012, permitted to 5,696 ft.

Completion filings report 6 formation tops, including Yates, Queen, San Andres, Wichita-Albany.

Operator of record

Stanolind Operating LLC

Midland, TX · P-5 Y, filed Jan 6, 2017 · 53 permits on file · (432) 425-7411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsFenway Energy Development Co.through Dec 2023
Latest permitStanolind Operating LLCSep 18, 2012
5,696
total depth, ft
3
permits on file
Sep 18, 2012
last permit issued
—
completed
0
cumulative oil, bbl
118K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
State-Baldwin G-10-136698Abell (McKee, NW.)Moonlite Oil & Gas Company10118KJan 1993 – Jul 2026
— O-10-28457——000—

Gas, mcf lease total

Last 12 months 0 · prior 12 0

012202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Haylan Oil CompanyJan 1993 → Mar 1997
  2. 2Hillside Oil & Gas, Inc.Apr 1997 → Nov 1999
  3. 3Hillside Oil & Gas LLCDec 1999 → Feb 2004
  4. 4Ipt Oil CompanyMar 2004 → Dec 2004
  5. 5Uhc Petroleum CorporationJan 2005 → Dec 2005
  6. 6Double Eagle Petroleum CorpJan 2006 → Jul 2006
  7. 7Premier Natural Resources, L.P.Aug 2006 → Feb 2007
  8. 8Premier Natural Resources, LLCMar 2007 → Nov 2011
  9. 9Stanolind Operating LLCDec 2011 → Sep 2013
  10. 10Memorial Production Oper. LLCOct 2013 → May 2016
  11. 11Boaz Energy II Operating, LLCJun 2016 → Mar 2017
  12. 12JTL Operating Co., IncApr 2017 → Dec 2018
  13. 13Fenway Energy Development Co.Jan 2019 → Dec 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
744975-99RecompletionStanolind Operating LLCJul 19, 2012Sep 18, 2012—5,696
219178-99RecompletionMobil Producing TX. & N.M. Inc.Aug 17, 1983Oct 6, 1983—5,600
193584-99RecompletionMobil Producing TX. & N.M. Inc.Apr 21, 1983May 6, 1983—5,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-136698————
—— O-10-28457————

Formation tops

As filed on W-2/G-1. Subsea from 2,392 ft elevation.Download CSV →

FormationMD ftSubsea
Yates1,2401,152
Queen1,900492
San Andres2,36032
Wichita-AlbanyWICHITA ALBANY4,220-1,828
Simpson4,825-2,433
McKee5,170-2,778

Perforations

Perforated and open-hole intervals.

FromToType
5,2135,222Perforated
5,2265,234Perforated
5,2425,244Perforated
5,2475,252Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.375434——
9.6253,530——
75,212——
4.55,692——
25,692——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 27, 1991Nov 19, 1990—
00Feb 4, 1991——
00Jul 9, 1984Nov 3, 1983—
00May 25, 1984Nov 3, 1983—
00Jan 12, 1984Jan 25, 1955—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37105415, documented in the API reference.