WELL · 42-371-32454 · DISTRICT 8
Harral #1
Pecos County · Vertical
Harral #1 (API 42-371-32454) is a plugged well in Pecos County, plugged February 8, 2007, last operated by Oxy USA Wtp LP.
The RRC has issued 5 drilling permits between 1978 and 2006, permitted to 27,000 ft.
Completion filings report 4 formation tops, including San Andres, Bone Spring, Wolfcamp, Pennsylvanian.
Operator of record
Houston, TX · P-5 Y, filed Sep 4, 2025 · 2,289 permits on file · (713) 215-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | OXY USA WTP LPDec 7, 2006 |
- 27,000
- total depth, ft
- 5
- permits on file
- Dec 7, 2006
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Feb 8, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Harral O-10-32524 | Harral (Leonard) | Valley Distributors, Inc. | 1 | 0 | 0 | Jan 1993 – Aug 2003 |
| — G-10-130797 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 630155-99 | Reenter | OXY USA WTP LP | Dec 7, 2006 | Dec 7, 2006 | Jan 15, 2007 | 20,300 |
| 412708-99 | Reenter | Chevron U. S. A. Inc. | Jun 11, 1993 | Jun 14, 1993 | Aug 8, 1993 | 27,000 |
| 368093-99 | Recompletion | Landmark Reserves, Inc. | Dec 29, 1989 | Jan 4, 1990 | — | 20,100 |
| 356100-99 | Reenter | Landmark Reserves, Inc. | Feb 15, 1989 | Feb 16, 1989 | — | 20,100 |
| 15705-99 | Drill | Aminoil USA Inc. | Jan 6, 1978 | Jan 6, 1978 | — | 20,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-10-130797 | — | — | — | — |
| — | — O-10-32524 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,937 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Andres | 3,250 | -313 |
| Bone SpringBONE SPRINGS | 7,080 | -4,143 |
| Wolfcamp | 14,645 | -11,708 |
| PennsylvanianPENN | 19,890 | -16,953 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,317 | 20,082 | Perforated |
| 7,080 | 7,280 | Perforated |
| 19,890 | 20,012 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,605 | 17.5 | 1,800 S |
| 2.875 | 6,970 | — | — |
| 9.625 | 11,666 | 12.25 | 4,390 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 4, 1990 | Feb 23, 1990 | Yes |
| 00 | Mar 5, 1990 | — | — |
| 00 | Jun 20, 1989 | May 8, 1989 | — |
| 00 | Jun 16, 1989 | — | — |
| 00 | Jan 12, 1984 | Nov 1, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-371-32454 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-371-32454 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/37132454, documented in the API reference.