WELL · 42-371-32758 · DISTRICT 8
Athey Charles B. -C- #2
Pecos County · Coyanosa N. (Delaware) field · Vertical
Athey Charles B. -C- #2 (API 42-371-32758) is a plugged well in Pecos County, plugged December 12, 2014, last operated by P.O.&G. Operating LLC.
The RRC has issued one drilling permit, issued May 1, 1979, permitted to 6,600 ft.
It was permitted by Mobil Oil Corporation and has since transferred to P.O.&G. Operating LLC on the wellbore schedule.
Its lease has reported 93.2K barrels of oil and 263K mcf of gas since January 1993, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Mobil Oil Corporation; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Aug 4, 2025 · 95 permits on file · (713) 244-0779
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | P.o.&g. Operating LLC |
| Production reports | Shell Western E&Pthrough Jan 2013 |
| Latest permit | Mobil Oil CorporationMay 1, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,600
- total depth, ft
- 1
- permits on file
- May 1, 1979
- last permit issued
- Jun 7, 1979
- completed
- 93.2K
- cumulative oil, bbl
- 263K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 7, 1979
- Shut in
- —
- Plugged
- Dec 12, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Athey, Charles B. -C- O-10-25296 | Coyanosa, N. (Delaware) | P.o.&g. Operating, LLC | 6 | 93.2K | 263K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mobil Producing TX. & N.M. Inc.Jan 1993 → Feb 2001
- 2Pecos Production CompanyDec 2002 → Dec 2004
- 3Chesapeake Operating, Inc.Jan 2005 → Jul 2011
- 4Shell Western E&PDec 2012 → Dec 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 47583-99 | Drill | Mobil Oil Corporation | May 1, 1979 | May 1, 1979 | — | 6,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-25296 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,814 | 4,816 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,830 | 12.25 | 800 S |
| 2.875 | 4,732 | — | — |
| 5.5 | 5,214 | 7.875 | 1,300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jul 5, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-371-32758 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-371-32758 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/37132758, documented in the API reference.