WELL · 42-371-32959 · DISTRICT 8

Silver Dollar 63 #1

Plugged

Pecos County  · Vertical

Silver Dollar 63 #1 (API 42-371-32959) is a plugged well in Pecos County, plugged February 6, 1980, last operated by Pinnacle Mining Corporation.

The RRC has issued 4 drilling permits between 1979 and 2014, permitted to 5,600 ft.

Completion filings report 4 formation tops, including Yates, Clear Fork, Wichita-Albany, McKee.

Its 3 leases have reported 30.5K barrels of oil and 32K mcf of gas since August 2000, last reporting in July 2026. The leases carry 7 wells, so these are lease totals, not this well alone.

Operator of record

Pinnacle Mining Corporation

Midland, TX · P-5 Y, filed Dec 4, 2025 · 41 permits on file · (877) 682-6002

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsRein Pusher Operating LLCthrough Apr 2026
Latest permitPinnacle Mining CorporationDec 9, 2014
5,600
total depth, ft
4
permits on file
Dec 9, 2014
last permit issued
—
completed
30.5K
cumulative oil, bbl
32K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2000 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Feb 6, 1980

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Silver Dollar 63 O-10-45490Pecos Valley (Low Gravity)Rein Pusher Operating LLC515.2K22.6KDec 2012 – Jul 2026
Silver Dollar O-10-40044Lehn-Apco (1600)Pinnacle Mining Corporation115.3K9.27KSep 2009 – Dec 2015
Sanford-Gray O-10-36361WildcatPinnacle Mining Corporation111117Aug 2000 – Jul 2010

Oil, barrels lease total

Last 12 months 1,072 · prior 12 1,133(-5%)

0100200300202420252026

Gas, mcf lease total

Last 12 months 803 · prior 12 828(-3%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pinnacle Mining CorporationJun 2009 → Dec 2023
  2. 2Rein Pusher Operating LLCJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
801147-99Field transferPinnacle Mining CorporationDec 3, 2014Dec 9, 2014Oct 2, 20105,589
677055-99RecompletionPinnacle Mining CorporationJan 6, 2009Jan 15, 2009Jan 22, 20092,750
491575-99ReenterOlsen Energy Inc.Jan 31, 2000Feb 3, 2000Mar 24, 20005,600
67245-99DrillLario Oil & Gas CompanyDec 19, 1979Dec 19, 1979—5,450

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-36361————
—— O-10-40044————
—— O-10-45490————

Formation tops

As filed on W-2/G-1. Subsea from 2,483 ft elevation.Download CSV →

FormationMD ftSubsea
Yates1,4101,073
YatesYATES / QUEEN1,4101,073
Clear Fork3,408-925
Wichita-AlbanyWICHITA ALBANY4,459-1,976
McKee5,540-3,057

Perforations

Perforated and open-hole intervals.

FromToType
1,4101,525Perforated
1,4101,648Perforated
3,4083,433Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37543317.5425 S
71,9039.625225 S
9.6252,85012.25800 S
4.55,5867.875835 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 12, 2014Dec 10, 2014—
00Dec 8, 2014Sep 16, 2014—
00Sep 14, 2010Dec 10, 2009Yes
00Jul 26, 2010——
00Sep 26, 2000May 25, 2000Yes
00Aug 16, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37132959, documented in the API reference.