WELL · 42-371-33170 · DISTRICT 8

Perry #1

Plugged

Pecos County · Priest & Beavers NE. (Queen) field  · Vertical

Perry #1 (API 42-371-33170) is a plugged well in Pecos County, plugged October 29, 2003, last operated by J-E Production Inc..

The RRC has issued one drilling permit, issued August 6, 1980, permitted to 2,100 ft.

It was permitted by Termo Company Of Texas and has since transferred to J-E Production Inc. on the wellbore schedule.

Its lease has reported 10.7K barrels of oil and 35 mcf of gas since January 1993, last reporting in March 2008.

Operator of record

J-E Production Inc.

Permitted by Termo Company of Texas; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Jan 7, 2005

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJ-E Production Inc.
Production reportsJ-E Production, Inc.through Jul 2002
Latest permitTermo Company of TexasAug 6, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,100
total depth, ft
1
permits on file
Aug 6, 1980
last permit issued
Oct 31, 1980
completed
10.7K
cumulative oil, bbl
35
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 31, 1980
Shut in
—
Plugged
Oct 29, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Perry O-10-26379Priest & Beavers, NE. (Queen)J-E Production, Inc.110.7K35Jan 1993 – Mar 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hewitt, Alan P.Jan 1993 → Aug 1997
  2. 2J-E Production, Inc.Sep 1997 → Jul 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
88908-99DrillTermo Company of TexasAug 6, 1980Aug 6, 1980—2,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-26379————

Perforations

Perforated and open-hole intervals.

FromToType
1,9782,001Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.625778—300 S
2.3752,002——
5.52,008—600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Dec 23, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37133170, documented in the API reference.