WELL · 42-371-34916 · DISTRICT 8
Tippett-Lynch #1
Pecos County · Vertical
Tippett-Lynch #1 (API 42-371-34916) is a permitted well in Pecos County filed by R. K. G. Engineering, Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits in 1984, permitted to 6,900 ft.
Completion filings report 3 formation tops, including San Andres, Hueco, Pen Detrital.
Operator of record
Odessa, TX · P-5 Y, filed Apr 7, 2017 · 92 permits on file · (432) 349-2256
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | R. K. G. Engineering, Inc.Oct 18, 1984 |
- 6,900
- total depth, ft
- 2
- permits on file
- Oct 18, 1984
- last permit issued
- —
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 254812-99 | Drill | R. K. G. Engineering, Inc. | Oct 4, 1984 | Oct 18, 1984 | Nov 11, 1984 | 6,900 |
| 236962-99 | Drill | R. K. G. Engineering, Inc. | Oct 9, 1984 | Apr 27, 1984 | — | 6,900 |
Formation tops
As filed on W-2/G-1. Subsea from 2,616 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Andres | 2,395 | 221 |
| Hueco | 4,510 | -1,894 |
| Pen Detrital | 6,405 | -3,789 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,516 | 6,528 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,115 | 11 | 500 S |
| 4.5 | 2,900 | 7.875 | 900 S |
| 4.5 | 6,660 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 15, 1985 | Dec 21, 1984 | — |
| 00 | Jan 4, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-371-34916 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-371-34916 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/37134916, documented in the API reference.