WELL · 42-371-35677 · DISTRICT 10

State "6" #1

Plugged

Pecos County  · Vertical

State "6" #1 (API 42-371-35677) is a plugged well in Pecos County, plugged October 27, 2004, last operated by Wilbanks, Bruce A. Company.

The RRC has issued 3 drilling permits between 1985 and 1999, permitted to 9,600 ft.

Operator of record

Wilbanks, Bruce A. Company

Midland, TX · P-5 Y, filed Feb 5, 2016 · 131 permits on file · (432) 967-0049

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitWilbanks, Bruce A. CompanyOct 19, 1999
9,600
total depth, ft
3
permits on file
Oct 19, 1999
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Oct 27, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
488556-99ReenterWilbanks, Bruce A. CompanyOct 15, 1999Oct 19, 1999—8,600
440938-99ReenterTopat Oil CorporationOct 17, 1995Oct 19, 1995—9,300
292454-99DrillHillin Prod. Co.Dec 5, 1985Dec 6, 1985—9,600

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37135677, documented in the API reference.