WELL · 42-371-39129 · DISTRICT 8

University BX #9R

N

Pecos County  · Vertical

University BX #9R (API 42-371-39129) is a permitted well in Pecos County filed by Finley Operations, Inc.; no completion report is on file yet.

The RRC has issued 2 drilling permits (amended once) between 2008 and 2013, permitted to 1,800 ft.

Completion filings report 3 formation tops, including Yates, Queen, San Andres.

Its lease has reported 125K barrels of oil and 24 mcf of gas since January 1993, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Finley Operations, Inc.

Coleman, TX · P-5 Y, filed Aug 4, 2017 · 1 permits on file · (325) 625-3804

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsTres Roughneckas WTX LLCthrough Feb 2025
Latest permitFinley Operations, Inc.Nov 22, 2013
1,800
total depth, ft
3
permits on file
Nov 22, 2013
last permit issued
—
completed
125K
cumulative oil, bbl
24
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
University -BX- O-10-6725Taylor LinkTres Roughneckas WTX LLC4125K24Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 49(-100%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1K & E Drilling, IncJan 1993 → Feb 1993
  2. 2K & E Petroleum, Inc.Mar 1993 → Dec 1994
  3. 3Mustang Oil & Gas CorporationJan 1995 → Oct 1995
  4. 4Badger Oil CompanyNov 1995 → Jun 1996
  5. 5Pharaoh Oil & Gas, Inc.Jul 1996 → Apr 2022
  6. 6Westco Producing CompanyDec 1996 → Aug 1997
  7. 7Westco Oil CompanySep 1997 → Sep 1998
  8. 8Xeric Oil & Gas CorporationNov 1999 → Dec 1999
  9. 9Hillside Oil & Gas LLCJan 2000 → Feb 2004
  10. 10Ipt Oil CompanyMar 2004 → Jul 2006
  11. 11Uhc Petroleum CorporationJan 2005 → Mar 2006
  12. 12Premier Natural Resources, L.P.Aug 2006 → Feb 2007
  13. 13Premier Natural Resources, LLCMar 2007 → May 2011
  14. 14Mid-States Operating CompanyJun 2011 → Nov 2011
  15. 15Finley Operations, Inc.Dec 2011 → May 2014
  16. 16Bofin, LLCOct 2015 → Oct 2019
  17. 17Tres Roughneckas WTX LLCJan 2023 → Feb 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
773826-99DrillFinley Operations, Inc.Nov 14, 2013Nov 22, 2013Dec 9, 20131,800
668073-98DrillPremier Natural Resources, LLCSep 3, 2008Oct 11, 2008—1,800
668073-99DrillPremier Natural Resources, LLCJul 31, 2008Aug 19, 2008—1,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-6725————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Yates950
Queen1,100
San Andres1,500

Perforations

Perforated and open-hole intervals.

FromToType
1,5001,676Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
75108.5200 S
4.51,5006.25150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 15, 2017Sep 22, 2017Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37139129, documented in the API reference.