WELL · 42-373-30902 · DISTRICT 3
Jackson H. No. 4 #4
Polk County · Zaporah (Wilcox) field · Vertical
Jackson H. NO. 4 #4 (API 42-373-30902) is a plugged well in Polk County, plugged August 6, 2013, last operated by Black Stone Energy Company LLC.
The RRC has issued 2 drilling permits between 1999 and 2004, permitted to 9,450 ft.
Completion filings report 3 formation tops, including Yegua, Wilcox, Zaporah Wilcox.
Its 2 leases have reported 56.7K barrels of oil and 1.36M mcf of gas since March 1999, last reporting in August 2013. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Black Stone Energy Company LLC
Houston, TX · P-5 Y, filed Dec 4, 2025 · 10 permits on file · (713) 819-5742
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Black Stone Energy Company LLC |
| Production reports | Black Stone Energy Company, LLCthrough Apr 2013 |
| Latest permit | Black Stone Energy Company, LLCSep 23, 2004 |
- 9,450
- total depth, ft
- 2
- permits on file
- Sep 23, 2004
- last permit issued
- Mar 12, 1999
- completed
- 56.7K
- cumulative oil, bbl
- 1.36M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1999 THROUGH Aug 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 12, 1999
- Shut in
- —
- Plugged
- Aug 6, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jackson, H. G-3-204034 | Chief Colabe (Wilcox) | Black Stone Energy Company, LLC | 1 | 0 | 1.32M | Sep 2004 – Aug 2013 |
| Jackson, H. No. 4 O-3-23644 | Zaporah (Wilcox) | Black Stone Energy Company, LLC | 1 | 56.7K | 46.7K | Mar 1999 – Dec 2004 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Black Stone Energy CompanyMar 1999 → Mar 2004
- 2Black Stone Energy Company, LLCApr 2004 → Apr 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 551184-99 | Recompletion | Black Stone Energy Company, LLC | Sep 17, 2004 | Sep 23, 2004 | — | 9,320 |
| 482515-99 | Drill | Black Stone Energy Company | Feb 8, 1999 | Feb 8, 1999 | Feb 11, 1999 | 9,450 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-204034 | — | — | — | — |
| — | — O-3-23644 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 304 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,516 | 8,518 | Perforated |
| 9,023 | 9,033 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,574 | 11 | 350 S |
| 5.5 | 9,320 | 7.875 | 420 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 27, 2004 | Oct 8, 2004 | Yes |
| 00 | Nov 5, 2004 | — | — |
| 00 | Apr 27, 1999 | Apr 2, 1999 | — |
| 00 | Apr 19, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-373-30902 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-373-30902 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.