WELL · 42-373-30932 · DISTRICT 3
Miller Edna P. #4
Polk County · New Ace (Wilcox Consol.) field · Vertical
Miller Edna P. #4 (API 42-373-30932) is a plugged well in Polk County, plugged May 27, 2026, last operated by Geopetra Partners LLC.
The RRC has issued one drilling permit (amended once), issued April 20, 2000, permitted to 11,300 ft.
It was permitted by Famcor Oil, Inc and has since transferred to Geopetra Partners LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Yegua, Wilcox.
Operator of record
Permitted by Famcor Oil, Inc; the EWA schedule now lists a different operator.
Irving, TX · P-5 Y, filed Feb 4, 2026 · 2 permits on file · (214) 207-5554
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Geopetra Partners LLC |
| Production reports | Geopetra Partners, LLCthrough Nov 2015 |
| Latest permit | Famcor Oil, IncApr 20, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,300
- total depth, ft
- 2
- permits on file
- Apr 20, 2000
- last permit issued
- Jul 3, 2000
- completed
- 0
- cumulative oil, bbl
- 588K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2000 THROUGH May 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 3, 2000
- Shut in
- —
- Plugged
- May 27, 2026
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Miller, Edna P. G-3-178018 | New Ace (Wilcox Consol.) | Geopetra Partners, LLC | 1 | 0 | 588K | Jul 2000 – May 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Famcor Oil, Inc.Jul 2000 → Jul 2004
- 2IpactSep 2004 → May 2005
- 3Sandhawk Energy, LLCJun 2005 → Jun 2011
- 4Geopetra Partners, LLCJul 2011 → Nov 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 494303-98 | Drill | Famcor Oil, Inc | Jul 31, 2000 | Apr 20, 2000 | — | 11,300 |
| 494303-99 | Drill | Famcor Oil, Inc | Apr 20, 2000 | Apr 20, 2000 | Apr 23, 2000 | 11,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-178018 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 87 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,190 | 10,206 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,665 | 12.75 | 370 S |
| 5.5 | 11,050 | 8.75 | 185 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 22, 2000 | Jul 31, 2000 | Yes |
| 00 | Aug 10, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-373-30932 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-373-30932 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/37330932, documented in the API reference.