WELL · 42-373-31077 · DISTRICT 3

Simmons A-70 #2H

Y

Polk County · Double a Wells N (Austin Chalk) field · Temp Abandoned  · Horizontal

Simmons A-70 #2H (API 42-373-31077) is a horizontal well in Polk County operated by Tala Energy LLC, completed March 16, 2007 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued August 2, 2006, permitted to 15,000 ft.

It was permitted by Delta Exploration Company, Inc. and has since transferred to Tala Energy LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Navarro, Taylor, Austin Chalk.

No lease production has been reported under this well’s leases.

Operator of record

Tala Energy LLC

Permitted by Delta Exploration Company, Inc.; the EWA schedule now lists a different operator.

College Sta, TX · P-5 Y, filed Jun 4, 2026 · (281) 635-6400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTala Energy LLC
Production reportsWalter Oil & Gas Corporationthrough Mar 2025
Latest permitDelta Exploration Company, Inc.Aug 2, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,000
total depth, ft
3
permits on file
Aug 2, 2006
last permit issued
Mar 16, 2007
completed
0
cumulative oil, bbl
6.81M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 16, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Simmons A-70 G-3-229794Double a Wells, N (Austin Chalk)Tala Energy LLC106.81MMar 2007 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 8,593(-100%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Delta Exploration Company, Inc.Mar 2007 → Aug 2010
  2. 2Wapiti Operating, LLCSep 2010 → Jan 2013
  3. 3Argent Energy (US) Holdings Inc.Feb 2013 → May 2016
  4. 4BXP Operating, LLCJun 2016 → Jun 2022
  5. 5Walter Oil & Gas CorporationJul 2022 → Mar 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
623690-97DrillDelta Exploration Company, Inc.May 21, 2007Aug 2, 2006Oct 28, 200615,000
623690-98DrillDelta Exploration Company, Inc.Nov 14, 2006Aug 2, 2006Oct 28, 200615,000
623690-99DrillDelta Exploration Company, Inc.Aug 2, 2006Aug 2, 2006Oct 28, 200615,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-229794————

Formation tops

As filed on W-2/G-1. Subsea from 326 ft elevation.Download CSV →

FormationMD ftSubsea
Navarro12,420-12,094
TaylorTAYLOR SHALE13,120-12,794
Austin Chalk13,592-13,266

Perforations

Perforated and open-hole intervals.

FromToType
13,73914,135Perforated
13,73917,765Perforated
13,73919,330Perforated
13,73920,240Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,63014.751,740 S
7.62513,7359.8751,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 5, 2007May 17, 2007Yes
00Oct 2, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37331077, documented in the API reference.