WELL · 42-373-31103 · DISTRICT 3

Best-Kenesson Willsource Unit #2H

Y

Polk County · Double a Wells N (Austin Chalk) field · Producing  · Horizontal

Best-Kenesson Willsource Unit #2H (API 42-373-31103) is a horizontal well in Polk County operated by Tala Energy LLC, completed February 8, 2008 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued September 5, 2007, permitted to 15,000 ft.

It was permitted by Delta Exploration Company, Inc. and has since transferred to Tala Energy LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Midway, Saratoga, Austin Chalk.

No lease production has been reported under this well’s leases.

Operator of record

Tala Energy LLC

Permitted by Delta Exploration Company, Inc.; the EWA schedule now lists a different operator.

College Sta, TX · P-5 Y, filed Jun 4, 2026 · (281) 635-6400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTala Energy LLC
Production reportsTala Energy LLCthrough Apr 2026
Latest permitDelta Exploration Company, Inc.Sep 5, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,000
total depth, ft
3
permits on file
Sep 5, 2007
last permit issued
Feb 8, 2008
completed
0
cumulative oil, bbl
1.25M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 8, 2008
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Best-Kenesson Willsource Unit G-3-243572Double a Wells, N (Austin Chalk)Tala Energy LLC101.25MFeb 2008 – Jul 2026

Gas, mcf lease total

Last 12 months 2,674 · prior 12 9,011(-70%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Delta Exploration Company, Inc.Feb 2008 → Aug 2010
  2. 2Wapiti Operating, LLCSep 2010 → Jan 2013
  3. 3Argent Energy (US) Holdings Inc.Mar 2013 → May 2016
  4. 4BXP Operating, LLCJun 2016 → Jun 2022
  5. 5Walter Oil & Gas CorporationJul 2022 → Sep 2025
  6. 6Tala Energy LLCOct 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
645433-97DrillDelta Exploration Company, Inc.Jun 17, 2008Sep 5, 2007Sep 18, 200715,000
645433-98DrillDelta Exploration Company, Inc.Dec 10, 2007Sep 5, 2007Sep 18, 200715,000
645433-99DrillDelta Exploration Company, Inc.Aug 31, 2007Sep 5, 2007Sep 18, 200715,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-243572————

Formation tops

As filed on W-2/G-1. Subsea from 302 ft elevation.Download CSV →

FormationMD ftSubsea
Midway10,722-10,420
Saratoga12,924-12,622
Austin Chalk13,637-13,335

Perforations

Perforated and open-hole intervals.

FromToType
14,22521,416Perforated
16,23217,228Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
162,527222,834 S
10.7511,50514.75979 S
7.62514,2259.5412 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 23, 2009Jun 18, 2008Yes
00Jan 8, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37331103, documented in the API reference.