WELL · 42-373-31109 · DISTRICT 3

Black Stone G #7

Plugged

Polk County · Patricia Ray (1ST Yegua) field  · Vertical

Black Stone G #7 (API 42-373-31109) is a plugged well in Polk County, plugged February 4, 2025, last operated by IV Standard LLC.

The RRC has issued one drilling permit, issued November 26, 2007, permitted to 5,100 ft.

It was permitted by Famcor Oil, Inc. and has since transferred to IV Standard LLC on the wellbore schedule.

Completion filings report one formation top, including Yegua.

Its lease has reported 1.24M barrels of oil and 432K mcf of gas since May 2002, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

Operator of record

IV Standard LLC

Permitted by Famcor Oil, Inc.; the EWA schedule now lists a different operator.

San Angelo, TX · P-5 Y, filed Apr 4, 2026 · (877) 918-5207

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleIV Standard LLC
Production reportsIV Standard, LLCthrough Jan 2026
Latest permitFamcor Oil, Inc.Nov 26, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,100
total depth, ft
1
permits on file
Nov 26, 2007
last permit issued
Sep 2, 2018
completed
1.24M
cumulative oil, bbl
432K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 2, 2018
Shut in
—
Plugged
Feb 4, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Black Stone G O-3-24192Patricia Ray (1ST Yegua)IV Standard, LLC81.24M432KMay 2002 – Jul 2026

Oil, barrels lease total

Last 12 months 1,866 · prior 12 2,318(-19%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 60 · prior 12 763(-92%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Famcor Oil, Inc.May 2002 → Apr 2016
  2. 2Arcadia Operating, LLCMay 2016 → Dec 2025
  3. 3IV Standard, LLCJan 2026 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
649649-99DrillFamcor Oil, Inc.Nov 14, 2007Nov 26, 2007Dec 12, 20075,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-24192————

Formation tops

As filed on W-2/G-1. Subsea from 182 ft elevation.Download CSV →

FormationMD ftSubsea
YeguaYEGUA TOP4,600-4,418
Yegua4,720-4,538
Yegua4,770-4,588

Perforations

Perforated and open-hole intervals.

FromToType
3,4023,422Perforated
3,4223,442Perforated
3,4863,506Perforated
3,5063,516Perforated
3,5333,540Perforated
3,5753,606Perforated
4,7604,780Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,65911440 S
5.55,0007.875400 S
5.55,0107.875400 S
5.55,1017.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 22, 2019Sep 12, 2018—
00Jan 28, 2009Nov 4, 2008—
00May 12, 2008Apr 3, 2008Yes
00Apr 30, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.82M
bbl, all reported
Feb 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000099118W-14 DisposalPlugged Feb 28, 20255,0001,0003,300–3,650

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37331109, documented in the API reference.