WELL · 42-375-31296 · DISTRICT 10
Masterson D #1108
Potter County · Panhandle (Red Cave) field · Vertical
Masterson D #1108 (API 42-375-31296) is a plugged well in Potter County, plugged August 24, 2001, last operated by Riata Energy Inc..
The RRC has issued one drilling permit, issued October 29, 1985, permitted to 2,300 ft.
It was permitted by Fraley Energy Corporation, Inc. and has since transferred to Riata Energy Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Red Cave, Panhandle Lime.
Its lease has reported 41.8K barrels of oil and 154K mcf of gas since January 1993, last reporting in July 2026. The lease carries 30 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Fraley Energy Corporation, Inc.; the EWA schedule now lists a different operator.
Oklahoma City, OK · P-5 Y, filed Apr 4, 2026 · 588 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Riata Energy Inc. |
| Production reports | Reneau Oil Co.through May 2017 |
| Latest permit | Fraley Energy Corporation, Inc.Oct 29, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,300
- total depth, ft
- 1
- permits on file
- Oct 29, 1985
- last permit issued
- Jan 7, 1986
- completed
- 41.8K
- cumulative oil, bbl
- 154K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 7, 1986
- Shut in
- —
- Plugged
- Aug 24, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 30 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Masterson O-14-6440 | Panhandle (Red Cave) | Reneau Oil Co. | 30 | 41.8K | 154K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Riata Energy, Inc.Jan 1993 → Jan 1997
- 2J.B. ExplorationFeb 1997 → Sep 1997
- 3Reneau Oil Co.Oct 1997 → Oct 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 288629-99 | Drill | Fraley Energy Corporation, Inc. | Oct 29, 1985 | Oct 29, 1985 | Nov 3, 1985 | 2,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-6440 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,368 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Red Cave | 1,938 | 1,430 |
| Panhandle Lime | 2,192 | 1,176 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,950 | 2,177 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 251 | 12.25 | 190 S |
| 5.5 | 2,228 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 9, 1987 | Feb 7, 1986 | Yes |
| 00 | Jun 5, 1987 | — | — |
| 00 | Feb 25, 1986 | Feb 7, 1986 | Yes |
| 00 | Feb 20, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-375-31296 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-375-31296 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/37531296, documented in the API reference.