WELL · 42-375-31366 · DISTRICT 10

Bivins Ranch #203

Y

Potter County · Bivins Ranch (Red Cave) field · Temp Abandoned  · Vertical

Bivins Ranch #203 (API 42-375-31366) is a well in Potter County operated by P.O.&G. Operating LLC, completed December 8, 1990 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued November 9, 1989, permitted to 3,000 ft.

It was permitted by Baker & Taylor Drilling CO. and has since transferred to P.O.&G. Operating LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Red Cave, Panhandle Lime.

No lease production has been reported under this well’s leases.

Operator of record

P.o.&g. Operating LLC

Permitted by Baker & Taylor Drilling Co.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Aug 4, 2025 · 95 permits on file · (713) 244-0779

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleP.o.&g. Operating LLC
Production reportsMid-Con Energy Operating, Inc.through Apr 2013
Latest permitBaker & Taylor Drilling Co.Nov 9, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,000
total depth, ft
1
permits on file
Nov 9, 1989
last permit issued
Dec 8, 1990
completed
0
cumulative oil, bbl
88.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 8, 1990
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bivins Ranch G-14-135337Bivins Ranch (Red Cave)P.o.&g. Operating, LLC1088.5KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ananda Energy Inc.Jan 1993 → Apr 1993
  2. 2Empire Operating, Inc.May 1993 → Jun 1994
  3. 3J. W. Resources Inc.Aug 1996 → Dec 1999
  4. 4Ricks Expl Acquisition CorpJan 2000 → May 2001
  5. 5Ricks Expl Acquisition LLCJun 2001 → Apr 2002
  6. 6Sand River O & E LLCMay 2002 → Dec 2004
  7. 7Questar Expl. and Prod. Co.Jan 2005 → Aug 2010
  8. 8QEP Energy CompanySep 2010 → Aug 2011
  9. 9RDT Properties, Inc.Sep 2011 → Mar 2012
  10. 10Mid-Con Energy Operating, Inc.Apr 2012 → Apr 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
366238-99DrillBaker & Taylor Drilling Co.Nov 9, 1989Nov 9, 1989—3,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-135337————

Formation tops

As filed on W-2/G-1. Subsea from 3,204 ft elevation.Download CSV →

FormationMD ftSubsea
Red Cave2,590614
Panhandle Lime2,880324

Perforations

Perforated and open-hole intervals.

FromToType
2,6222,630Perforated
2,6502,654Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62535112.25170 S
5.52,7977.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 24, 1991Feb 8, 1991—
00Oct 16, 1990May 23, 1990—
00Aug 10, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.