WELL · 42-379-30153 · DISTRICT 6
W. Yantis GU 2 #5
Rains County · Yantis SW. (Smackover) field · Directional
W. Yantis GU 2 #5 (API 42-379-30153) is a plugged well in Rains County, plugged February 3, 2009, last operated by Valence Operating Company.
The RRC has issued 2 drilling permits between 1999 and 2008, permitted to 13,400 ft.
Completion filings report 3 formation tops, including Haynesville, Buckner, Smackover.
Operator of record
Kingwood, TX · P-5 Y, filed Apr 4, 2026 · 990 permits on file · (281) 359-3659
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Valence Operating Company |
| Production reports | Valence Operating Companythrough Sep 2008 |
| Latest permit | Valence Operating CompanyNov 13, 2008 |
- 13,400
- total depth, ft
- 2
- permits on file
- Nov 13, 2008
- last permit issued
- Dec 30, 1999
- completed
- 0
- cumulative oil, bbl
- 8.05M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 1999 THROUGH Feb 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 30, 1999
- Shut in
- —
- Plugged
- Feb 3, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| W. Yantis GU 2 G-6-177229 | Yantis, SW. (Smackover) | Valence Operating Company | 1 | 0 | 8.05M | Dec 1999 – Feb 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Valence Operating CompanyDec 1999 → Sep 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 674223-99 | Recompletion | Valence Operating Company | Oct 31, 2008 | Nov 13, 2008 | Nov 28, 2008 | 13,000 |
| 486839-99 | Drill | Valence Operating Company | Aug 20, 1999 | Aug 20, 1999 | Sep 1, 1999 | 13,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-177229 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 440 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Haynesville | 12,510 | -12,070 |
| Buckner | 13,053 | -12,613 |
| Smackover | 13,394 | -12,954 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 13,394 | 13,406 | Perforated |
| 13,416 | 13,418 | Perforated |
| 13,421 | 13,422 | Perforated |
| 13,426 | 13,428 | Perforated |
| 13,430 | 13,432 | Perforated |
| 13,436 | 13,438 | Perforated |
| 13,440 | 13,446 | Perforated |
| 13,452 | 13,456 | Perforated |
| 13,461 | 13,464 | Perforated |
| 13,466 | 13,473 | Perforated |
| 13,478 | 13,480 | Perforated |
| 13,486 | 13,488 | Perforated |
| 13,504 | 13,508 | Perforated |
| 13,510 | 13,518 | Perforated |
| 13,530 | 13,532 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 1.583 | 307 | 17.5 | 380 S |
| 9.625 | 5,174 | 12.25 | 880 S |
| 7 | 13,755 | 8.75 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 6, 2000 | Mar 9, 2000 | Yes |
| 00 | Jun 15, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-379-30153 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-379-30153 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/37930153, documented in the API reference.