WELL · 42-383-01490 · DISTRICT 7

Stanolind #1

Plugged

Reagan County · Spraberry (Trend Area CL. Fk.) field  · Vertical

Stanolind #1 (API 42-383-01490) is a plugged well in Reagan County, plugged October 3, 2011, last operated by Diamondback E&P LLC.

The RRC has issued one drilling permit, issued December 14, 1998, permitted to 8,650 ft.

It was permitted by Energen Resources Corporation and has since transferred to Diamondback E&P LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Spraberry, Dean.

Its 3 leases have reported 112K barrels of oil and 189K mcf of gas since January 1993, last reporting in July 2024. The leases carry 11 wells, so these are lease totals, not this well alone.

Operator of record

Diamondback E&P LLC

Permitted by Energen Resources Corporation; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Mar 4, 2026 · 5,231 permits on file · (855) 247-5920

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDiamondback E&P LLC
Production reportsDiamondback E&P LLCthrough Apr 2020
Latest permitEnergen Resources CorporationDec 14, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,650
total depth, ft
1
permits on file
Dec 14, 1998
last permit issued
Dec 18, 1998
completed
112K
cumulative oil, bbl
189K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 18, 1998
Shut in
—
Plugged
Oct 3, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stanolind O-10-31027Spraberry (Trend Area CL. Fk.)Diamondback E&P LLC593.3K117KJan 1993 – Jul 2024
Stanolind O-9-13918Spraberry (Trend Area)Energen Resources Corporation311.5K37KNov 1995 – May 1999
Standlind O-9-6971Calvin (Dean)BC Operating, Inc.37.35K34.2KJan 1993 – Mar 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1BC Operating, Inc.Jan 1993 → Feb 1998
  2. 2Taurus Exploration U.S.A., Inc.Mar 1998 → Nov 1998
  3. 3Energen Resources CorporationDec 1998 → Jan 2019
  4. 4Diamondback E&P LLCFeb 2019 → Apr 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
481470-99RecompletionEnergen Resources CorporationDec 14, 1998Dec 14, 1998Dec 10, 19988,650

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-6971————
—— O-9-13918————
—— O-10-31027————

Formation tops

As filed on W-2/G-1. Subsea from 2,712 ft elevation.Download CSV →

FormationMD ftSubsea
SpraberrySPRABERRY CLFK6,385-3,673
Spraberry6,891-4,179
Dean8,293-5,581

Perforations

Perforated and open-hole intervals.

FromToType
6,3746,384Perforated
8,3258,560Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
76,8438.75500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 20, 1999Mar 22, 1999Yes
00Mar 30, 1999Sep 21, 1976—
00Dec 11, 1995Sep 21, 1976—
00Jan 12, 1984Sep 21, 1976—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/38301490, documented in the API reference.