WELL · 42-383-33679 · DISTRICT 7

University 24 #2

Plugged

Reagan County · Spraberry (Trend Area) field  · Vertical

University 24 #2 (API 42-383-33679) is a plugged well in Reagan County, plugged June 28, 2011, last operated by Endeavor Energy Resources L.P..

The RRC has issued one drilling permit, issued December 20, 1985, permitted to 7,500 ft.

It was permitted by Kaneb Energy Company and has since transferred to Endeavor Energy Resources L.P. on the wellbore schedule.

Completion filings report 5 formation tops, including Grayburg, Spraberry, Jo Mill, Dean.

Its lease has reported 42.1K barrels of oil and 479K mcf of gas since January 1993, last reporting in November 2011. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Endeavor Energy Resources L.P.

Permitted by Kaneb Energy Company; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Apr 4, 2026 · 6,190 permits on file · (855) 247-5920

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEndeavor Energy Resources L.P.
Production reportsEndeavor Energy Resources L.P.through Mar 2011
Latest permitKaneb Energy CompanyDec 20, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
1
permits on file
Dec 20, 1985
last permit issued
Feb 7, 1986
completed
42.1K
cumulative oil, bbl
479K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2011

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 7, 1986
Shut in
—
Plugged
Jun 28, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
University "24" O-9-11696Spraberry (Trend Area)Endeavor Energy Resources L.P.442.1K479KJan 1993 – Nov 2011

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amax Oil & Gas Inc.Jan 1993 → Apr 1993
  2. 2Consolidated Oil & Gas, IncMay 1993 → Aug 1995
  3. 3Hugoton Energy CorporationSep 1995 → Mar 1998
  4. 4Chesapeake Operating, Inc.Apr 1998 → Sep 1999
  5. 5Nadel and Gussman Permian,l.l.c.Oct 1999 → Jul 2002
  6. 6Pure Resources, L.P.Aug 2002 → Apr 2003
  7. 7Endeavor Energy Resources L.P.May 2003 → Apr 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
293418-99DrillKaneb Energy CompanyDec 30, 1985Dec 20, 1985Jan 14, 19867,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-11696————

Formation tops

As filed on W-2/G-1. Subsea from 2,666 ft elevation.Download CSV →

FormationMD ftSubsea
Grayburg2,940-274
SpraberryUPPER SPRABERRY5,594-2,928
SpraberryMIDDLE SPRABERRY6,112-3,446
Jo MillJO-MILL6,398-3,732
Dean6,864-4,198
Wolfcamp7,026-4,360

Perforations

Perforated and open-hole intervals.

FromToType
5,5885,901Perforated
6,1236,339Perforated
6,3976,512Perforated
6,8677,062Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62572612.25330 S
5.57,2007.875875 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 27, 1986Feb 24, 1986Yes
00Feb 26, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/38333679, documented in the API reference.