WELL · 42-383-34955 · DISTRICT 7

Pink Draw North #7

Y

Reagan County · Joned (Fusselman) field · Shut IN  · Vertical

Pink Draw North #7 (API 42-383-34955) is a well in Reagan County operated by Discovery Natural Resources LLC, completed February 16, 1999 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued December 2, 1998, permitted to 10,500 ft.

It was permitted by Alegre Energy, Inc. and has since transferred to Discovery Natural Resources LLC on the wellbore schedule.

Completion filings report 5 formation tops, including San Andres, Spraberry, Wolfcamp, Devonian.

Its lease has reported 574K barrels of oil and 440K mcf of gas since January 1999, last reporting in July 2026.

Operator of record

Discovery Natural Resources LLC

Permitted by Alegre Energy, Inc.; the EWA schedule now lists a different operator.

Denver, CO · P-5 Y, filed Oct 4, 2025 · 451 permits on file · (303) 893-5073

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDiscovery Natural Resources LLC
Production reportsDiscovery Natural Resources LLCthrough Jun 2017
Latest permitAlegre Energy, Inc.Dec 2, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,500
total depth, ft
2
permits on file
Dec 2, 1998
last permit issued
Feb 16, 1999
completed
574K
cumulative oil, bbl
440K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 16, 1999
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pink Draw North O-9-14874Joned (Fusselman)Discovery Natural Resources LLC1574K440KJan 1999 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tmbr/Sharp Drilling, Inc.Jan 1999 → Feb 2004
  2. 2Patterson Petroleum LPMar 2004 → May 2007
  3. 3BC Operating, Inc.Jun 2007 → Nov 2012
  4. 4PPC Operating Company LLCDec 2012 → Nov 2016
  5. 5Discovery Natural Resources LLCDec 2016 → Jun 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
481239-97DrillAlegre Energy, Inc.Dec 18, 1998Dec 2, 1998—7,500
481239-99DrillTmbr/Sharp Drilling, Inc.Dec 2, 1998Dec 2, 1998Dec 2, 199810,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-14874————

Formation tops

As filed on W-2/G-1. Subsea from 2,465 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres2,140325
Spraberry5,072-2,607
Wolfcamp6,900-4,435
Devonian9,600-7,135
Fusselman9,842-7,377

Perforations

Perforated and open-hole intervals.

FromToType
9,8449,848Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37565017.5555 S
8.6254,420111,675 S
5.59,9297.875100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 12, 1999Mar 12, 1999Yes
00Apr 15, 1999—Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/38334955, documented in the API reference.