WELL · 42-383-35080 · DISTRICT 9

University 14 #1

Plugged

Reagan County  · Vertical

University 14 #1 (API 42-383-35080) is a plugged well in Reagan County, plugged March 6, 2003, last operated by Triple "N" Services, Inc..

The RRC has issued 2 drilling permits (amended once) between 2000 and 2003, permitted to 10,500 ft.

Operator of record

Triple "N" Services, Inc.

Midland, TX · P-5 Y, filed Apr 8, 2011 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitTriple "N" Services, Inc.Mar 7, 2003
10,500
total depth, ft
3
permits on file
Mar 7, 2003
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Mar 6, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
529088-99ReenterTriple "N" Services, Inc.Mar 3, 2003Mar 7, 2003Feb 27, 20033,090
496500-98DrillGreat Western Drlg. Co.Jul 13, 2000Jun 26, 2000Jun 29, 200010,500
496500-99DrillGreat Western Drlg. Co.Jun 23, 2000Jun 26, 2000—9,200

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/38335080, documented in the API reference.