WELL · 42-385-30133 · DISTRICT 1
Jenkins #586
Real County · Cool Water Ranch (Wlfc a Coal) field · Vertical
Jenkins #586 (API 42-385-30133) is a plugged well in Real County, plugged February 28, 2020, last operated by Muskegon Development Company.
The RRC has issued one drilling permit, issued March 4, 2009, permitted to 2,800 ft.
It was permitted by Diamondback Operating, LP and has since transferred to Muskegon Development Company on the wellbore schedule.
Completion filings report one formation top, including Wolfcamp.
Operator of record
Permitted by Diamondback Operating, LP; the EWA schedule now lists a different operator.
MT Pleasant, MI · P-5 Y, filed Feb 7, 2020 · 17 permits on file · (989) 772-4900
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Muskegon Development Company |
| Production reports | Muskegon Development Companythrough Sep 2019 |
| Latest permit | Diamondback Operating, LPMar 4, 2009 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,800
- total depth, ft
- 1
- permits on file
- Mar 4, 2009
- last permit issued
- Jul 18, 2009
- completed
- 0
- cumulative oil, bbl
- 139K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2009 THROUGH Feb 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 18, 2009
- Shut in
- —
- Plugged
- Feb 28, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jenkins G-1-255052 | Cool Water Ranch (Wlfc "a" Coal) | Muskegon Development Company | 1 | 0 | 139K | Jul 2009 – Feb 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Diamondback Operating, LPSep 2009 → May 2012
- 2Muskegon Development CompanyJun 2012 → Sep 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 678741-99 | Drill | Diamondback Operating, LP | Feb 19, 2009 | Mar 4, 2009 | May 6, 2009 | 2,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-255052 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,278 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| WolfcampWOLFCAMP "A" COAL | 2,296 | -18 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,296 | 2,330 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,297 | 12.25 | 600 S |
| 5.5 | 2,593 | 7.875 | 240 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 16, 2010 | Jan 15, 2010 | Yes |
| 00 | Mar 17, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-385-30133 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-385-30133 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/38530133, documented in the API reference.