WELL · 42-389-00816 · DISTRICT 8

Rape J. M. #2 D

Plugged

Reeves County · Cable (Delaware) field  · Vertical

Rape J. M. #2 D (API 42-389-00816) is a plugged well in Reeves County, plugged August 25, 1993, last operated by Triple N Services Inc..

The RRC has issued one drilling permit, issued September 16, 1980, permitted to 5,190 ft.

It was permitted by Newman, Fred M. Inc. and has since transferred to Triple N Services Inc. on the wellbore schedule.

Completion filings report one formation top, including Castile.

Its lease has reported 28.7K barrels of oil and 429 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Triple N Services Inc.

Permitted by Newman, Fred M. Inc.; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Apr 8, 2011 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTriple N Services Inc.
Production reportsTriple "N" Services, Inc.through Jun 2002
Latest permitNewman, Fred M. Inc.Sep 16, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,190
total depth, ft
1
permits on file
Sep 16, 1980
last permit issued
Sep 16, 1991
completed
28.7K
cumulative oil, bbl
429
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 16, 1991
Shut in
—
Plugged
Aug 25, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rape, J. M. O-10-25408Cable (Delaware)Triple "N" Services, Inc.228.7K429Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Triple "N" Services, Inc.Jan 1993 → Jun 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
92724-99OtherNewman, Fred M. Inc.Sep 16, 1980Sep 16, 1980—5,190

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-25408————

Formation tops

As filed on W-2/G-1. Subsea from 2,741 ft elevation.Download CSV →

FormationMD ftSubsea
CastileCASTILLE3,600-859
Castile3,615-874

Perforations

Perforated and open-hole intervals.

FromToType
2,8953,910Perforated
3,6103,630Perforated
3,6163,630Perforated
3,7403,755Perforated
3,8153,830Perforated
3,8953,910Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.75513—400 S
2.53,503——
75,225—3,074 S
75,2259.8753,079 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 5, 1991Jul 9, 1991—
00Jan 12, 1984Sep 17, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

20
bbl, last 12 reported months
173K
bbl, all reported
Jun 1993
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000040601W-14 DisposalPlugged Aug 26, 19936006003,900–4,100

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 20 · prior 12 0

0102019921993

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/38900816, documented in the API reference.