WELL · 42-389-31286 · DISTRICT 8

Rape J. M. #3

Plugged

Reeves County · Waha West (Delaware) field  · Vertical

Rape J. M. #3 (API 42-389-31286) is a plugged well in Reeves County, plugged November 19, 2010, last operated by Breck Operating Corp..

The RRC has issued one drilling permit, issued July 29, 1982, permitted to 5,450 ft.

It was permitted by Gulf Oil Corp. and has since transferred to Breck Operating Corp. on the wellbore schedule.

Completion filings report 2 formation tops, including Lamar, Bell Canyon.

Its lease has reported 19.4K barrels of oil and 37.3K mcf of gas since January 1993, last reporting in May 2013. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

Breck Operating Corp.

Permitted by Gulf Oil Corp.; the EWA schedule now lists a different operator.

Breckenridge, TX · P-5 Y, filed Mar 8, 2019 · 295 permits on file · (254) 559-0881

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBreck Operating Corp.
Production reportsBreck Operating Corp.through Dec 2012
Latest permitGulf Oil Corp.Jul 29, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,450
total depth, ft
1
permits on file
Jul 29, 1982
last permit issued
Jan 30, 1995
completed
19.4K
cumulative oil, bbl
37.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 30, 1995
Shut in
—
Plugged
Nov 19, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rape, J. M. O-10-22370Waha, West (Delaware)Breck Operating Corp.519.4K37.3KJan 1993 – May 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Williams Oil CompanyJan 1993 → Jan 1994
  2. 2Southwest Royalties, Inc.Feb 1994 → Jun 1998
  3. 3Creamer, Donald R., Inc.Jul 1998 → Mar 2006
  4. 4Breck Operating Corp.Apr 2006 → Aug 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
167625-99DrillGulf Oil Corp.Jul 29, 1982Jul 29, 1982Aug 27, 19825,450

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-22370————
—— O-10-22370————

Formation tops

As filed on W-2/G-1. Subsea from 2,637 ft elevation.Download CSV →

FormationMD ftSubsea
Lamar5,003-2,366
Bell Canyon5,034-2,397

Perforations

Perforated and open-hole intervals.

FromToType
5,0495,060Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,41212.25750 S
2.8755,056——
5.55,1507.8751,084 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 11, 1995Feb 27, 1995—
00Mar 22, 1995Oct 28, 1982—
00Jan 12, 1984Oct 28, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
2.58M
bbl, all reported
Apr 2011
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000081956H-1 InjectionPlugged Dec 16, 20101,2001,5005,030–5,063

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 95,134(-100%)

010K20K30K20102011

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/38931286, documented in the API reference.