WELL · 42-389-31912 · DISTRICT 8
Phillips -66- #2
Reeves County · Ken Regan (Delaware) field · Vertical
Phillips -66- #2 (API 42-389-31912) is a plugged well in Reeves County, plugged November 13, 2025, last operated by RE-OP Corp..
The RRC has issued one drilling permit, issued October 26, 1989, permitted to 3,600 ft.
It was permitted by New Horizon Exploration, Inc. and has since transferred to RE-OP Corp. on the wellbore schedule.
Completion filings report 2 formation tops, including Bell Canyon, Delaware.
Its lease has reported 5.75K barrels of oil and 43.3K mcf of gas since January 1993, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by New Horizon Exploration, Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Aug 4, 2025
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | RE-OP Corp. |
| Production reports | RE-OP Corp.through Sep 2001 |
| Latest permit | New Horizon Exploration, Inc.Oct 26, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,600
- total depth, ft
- 1
- permits on file
- Oct 26, 1989
- last permit issued
- Jan 24, 1990
- completed
- 5.75K
- cumulative oil, bbl
- 43.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 24, 1990
- Shut in
- —
- Plugged
- Nov 13, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Phillips -66- O-10-32571 | Ken Regan (Delaware) | RE-OP Corp. | 4 | 5.75K | 43.3K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1New Horizon Exploration, Inc.Jan 1993 → Apr 1999
- 2Linop CorporationMay 1999 → Oct 2000
- 3RE-OP Corp.Nov 2000 → Sep 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 365672-99 | Drill | New Horizon Exploration, Inc. | Oct 26, 1989 | Oct 26, 1989 | — | 3,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-32571 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,840 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bell CanyonBELL CANYON #2 | 3,407 | -567 |
| Bell CanyonBELL CANYON #1 | 3,442 | -602 |
| Delaware | 3,493 | -653 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,493 | 3,500 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 253 | 12.25 | 215 S |
| 4.5 | 3,621 | 7.875 | 629 S |
| 4.5 | — | 7.875 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 25, 1990 | Mar 30, 1990 | Yes |
| 00 | Apr 20, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-389-31912 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-389-31912 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/38931912, documented in the API reference.