WELL · 42-389-32045 · DISTRICT 8
TXL 43 #4
Reeves County · Jeanita (Cherry Canyon) field · Vertical
Txl 43 #4 (API 42-389-32045) is a plugged well in Reeves County, plugged August 26, 2019, last operated by Shell Western E&P.
The RRC has issued one drilling permit, issued June 28, 1993, permitted to 7,000 ft.
It was permitted by Manzano Oil Corporation and has since transferred to Shell Western E&P on the wellbore schedule.
Completion filings report 2 formation tops, including Lamar, Cherry Canyon.
Its lease has reported 377K barrels of oil and 826K mcf of gas since January 1993, last reporting in July 2020. The lease carries 9 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Manzano Oil Corporation; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Nov 4, 2025 · 1,756 permits on file · (713) 454-3197
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Shell Western E&P |
| Production reports | Shell Western E&Pthrough Jan 2014 |
| Latest permit | Manzano Oil CorporationJun 28, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,000
- total depth, ft
- 1
- permits on file
- Jun 28, 1993
- last permit issued
- Nov 5, 1993
- completed
- 377K
- cumulative oil, bbl
- 826K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 5, 1993
- Shut in
- —
- Plugged
- Aug 26, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| TXL "43" O-10-33635 | Jeanita (Cherry Canyon) | Shell Western E&P | 9 | 377K | 826K | Jan 1993 – Jul 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Manzano Oil CorporationJan 1993 → Dec 2000
- 2Concho Oil & Gas Corp.Jan 2001 → May 2003
- 3Concho Resources Inc.Jun 2003 → Mar 2004
- 4Chesapeake Operating, Inc.Apr 2004 → Sep 2012
- 5Shell Western E&POct 2012 → Oct 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 413287-99 | Drill | Manzano Oil Corporation | Jun 28, 1993 | Jun 28, 1993 | Jul 9, 1993 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-33635 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,788 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Lamar | 2,990 | -202 |
| Cherry Canyon | 3,929 | -1,141 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,515 | 5,557 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,175 | 12.25 | 675 S |
| 5.5 | 5,679 | 7.875 | 750 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 26, 1994 | Dec 3, 1993 | Yes |
| 00 | Dec 17, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-389-32045 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-389-32045 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/38932045, documented in the API reference.