WELL · 42-389-32091 · DISTRICT 8
TXL 43 #9
Reeves County · M. A. J. (Olds 3370) field · Vertical
Txl 43 #9 (API 42-389-32091) is a plugged well in Reeves County, plugged February 21, 2011, last operated by Chesapeake Operating Inc..
The RRC has issued one drilling permit (amended once), issued October 30, 1995, permitted to 3,150 ft.
It was permitted by Manzano Oil Corporation and has since transferred to Chesapeake Operating Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Ramsey, Olds, Olds Pay.
Its lease has reported 4.25K barrels of oil and 11.7K mcf of gas since June 1996, last reporting in June 2011.
Operator of record
Permitted by Manzano Oil Corporation; the EWA schedule now lists a different operator.
Oklahoma City, OK · P-5 Y, filed Jul 4, 2026 · 13,061 permits on file · (405) 935-7500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Chesapeake Operating Inc. |
| Production reports | Manzano Oil Corporationthrough Sep 1999 |
| Latest permit | Manzano Oil CorporationOct 30, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,150
- total depth, ft
- 2
- permits on file
- Oct 30, 1995
- last permit issued
- Dec 30, 1995
- completed
- 4.25K
- cumulative oil, bbl
- 11.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1996 THROUGH Jun 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 30, 1995
- Shut in
- —
- Plugged
- Feb 21, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| TXL "43" O-10-34964 | M. A. J. (Olds 3370) | Chesapeake Operating, Inc. | 1 | 4.25K | 11.7K | Jun 1996 – Jun 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Manzano Oil CorporationJun 1996 → Sep 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 441350-98 | Drill | Manzano Oil Corporation | Mar 11, 1996 | Oct 30, 1995 | — | 3,150 |
| 441350-99 | Drill | Manzano Oil Corporation | Oct 30, 1995 | Oct 30, 1995 | Nov 14, 1995 | 3,150 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-34964 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,787 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Ramsey | 2,994 | -207 |
| Olds | 3,024 | -237 |
| Olds Pay | 3,069 | -282 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,058 | 3,114 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,069 | 12.25 | 625 S |
| 5.5 | 3,058 | 7.875 | 550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 18, 1996 | Jan 9, 1996 | Yes |
| 00 | Jul 9, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-389-32091 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-389-32091 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/38932091, documented in the API reference.