WELL · 42-389-33722 · DISTRICT 8
Carl H 55 #1H
Reeves County · Hoefs T-K (Wolfcamp) field · Horizontal
Carl H 55 #1H (API 42-389-33722) is a plugged horizontal well in Reeves County, plugged April 30, 2020, last operated by Cog Operating LLC.
The RRC has issued one drilling permit, issued April 10, 2013, permitted to 15,000 ft.
It was permitted by Red Willow Production, LLC and has since transferred to Cog Operating LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Brushy Canyon, Bone Spring, Wolfcamp.
Its lease has reported 75.6K barrels of oil and 162K mcf of gas since April 2013, last reporting in August 2020.
Operator of record
Permitted by Red Willow Production, LLC; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed May 4, 2026 · 4,568 permits on file · (432) 853-2355
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | COG Operating LLC |
| Production reports | COG Operating LLCthrough Dec 2019 |
| Latest permit | Red Willow Production, LLCApr 10, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 15,000
- total depth, ft
- 1
- permits on file
- Apr 10, 2013
- last permit issued
- Oct 3, 2013
- completed
- 75.6K
- cumulative oil, bbl
- 162K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2013 THROUGH Aug 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 3, 2013
- Shut in
- —
- Plugged
- Apr 30, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Carl H 55 O-10-45367 | Phantom (Wolfcamp) | COG Operating LLC | 1 | 75.6K | 162K | Apr 2013 – Aug 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1COG Operating LLCOct 2013 → Dec 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 760182-99 | Drill | Red Willow Production, LLC | Apr 7, 2013 | Apr 10, 2013 | May 10, 2013 | 15,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-45367 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,027 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brushy Canyon | 7,096 | -4,069 |
| Bone SpringFIRST BONE SPRINGS | 8,721 | -5,694 |
| Wolfcamp | 10,050 | -7,023 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,000 | 14,200 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,655 | 17.5 | 1,350 S |
| 9.625 | 9,191 | 12.25 | 1,700 S |
| 5.5 | 14,513 | 8.5 | 1,880 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 14, 2014 | Apr 4, 2014 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-389-33722 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-389-33722 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/38933722, documented in the API reference.