WELL · 42-389-34522 · DISTRICT 10

Jett Rink State 59-25 #1D

N

Reeves County  · Vertical

Jett Rink State 59-25 #1D (API 42-389-34522) is a former disposal or injection well in Reeves County, last operated by Elevation Resources LLC; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued September 17, 2014, permitted to 6,500 ft.

Operator of record

Elevation Resources LLC

Midland, TX · P-5 Y, filed Feb 4, 2026 · 158 permits on file · (432) 334-5743

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitElevation Resources LLCSep 17, 2014
6,500
total depth, ft
1
permits on file
Sep 17, 2014
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
795136-99DrillElevation Resources LLCAug 27, 2014Sep 17, 2014—6,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Apr 2017
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000111308W-14 DisposalCanceled Jul 20, 201720,0001,9003,800–5,200

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120162017

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/38934522, documented in the API reference.