WELL · 42-389-35082 · DISTRICT 8

Allman 24 #6H

Y

Reeves County · Ford West (Wolfcamp) field · Temp Abandoned  · Horizontal

Allman 24 #6H (API 42-389-35082) is a horizontal well in Reeves County operated by Eog Resources Inc., completed June 2, 2017 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued November 3, 2015, permitted to 10,250 ft.

It was permitted by Atlantic Resources Company, LLC and has since transferred to Eog Resources Inc. on the wellbore schedule.

Completion filings report 8 formation tops, including Castile, Delaware, Permian (undifferentiated), Bell Canyon.

No lease production has been reported under this well’s leases.

Operator of record

EOG Resources Inc.

Permitted by Atlantic Resources Company, LLC; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Jul 4, 2026 · 16,344 permits on file · (713) 594-5431

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsVicterra Energy, LLCthrough Feb 2020
Latest permitEndurance Resources LLCNov 3, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,250
total depth, ft
2
permits on file
Nov 3, 2015
last permit issued
Jun 2, 2017
completed
0
cumulative oil, bbl
1.7M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2017 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 2, 2017
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Allman 24 G-10-283015Ford, West (Wolfcamp)EOG Resources, Inc.101.7MJun 2017 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Atlantic Resources Company, LLCJun 2017 → Oct 2019
  2. 2Victerra Energy, LLCNov 2019 → Feb 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
811531-98DrillAtlantic Resources Company, LLCJan 19, 2017Nov 3, 2015Mar 1, 201710,250
811531-99DrillEndurance Resources LLCOct 27, 2015Nov 3, 2015Mar 1, 201710,250

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-283015————

Formation tops

As filed on W-2/G-1. Subsea from 3,259 ft elevation.Download CSV →

FormationMD ftSubsea
CastileCASTILLE1,3071,952
Delaware3,056203
DelawareDELAWARE CONSOLIDATED GAS3,056203
DelawareFORD-DELAWARE3,056203
Permian (undifferentiated)PERMIAN3,056203
Bell Canyon3,086173
Cherry Canyon4,036-777
Bone SpringBONE SPRINGS6,501-3,242
Wolfcamp9,433-6,174
Pennsylvanian——

Perforations

Perforated and open-hole intervals.

FromToType
10,08715,972Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,31117.51,075 S
9.6259,07212.25850 S
5.516,0438.52,506 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 25, 2018Aug 16, 2018Yes
00Jan 19, 2018Sep 13, 2017Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.