WELL · 42-389-35373 · DISTRICT 8

Orla North SWD #1

WaterY

Reeves County · Red Bluff (Consolidated) field · Injection  · Vertical

Orla North Swd #1 (API 42-389-35373) is a well in Reeves County operated by Pilot Water Solutions Permianllc, completed June 17, 2023 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued September 7, 2016, permitted to 6,100 ft.

It was permitted by Rbj & Associates, LP and has since transferred to Pilot Water Solutions Permianllc on the wellbore schedule.

Completion filings report 8 formation tops, including Delaware, Castile, Bell Canyon, Bone Spring.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 6.73M barrels injected in the 12 months reported through April 2026.

Operator of record

Pilot Water Solutions Permianllc

Permitted by RBJ & Associates, LP; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed May 4, 2026 · 21 permits on file · (432) 699-9366

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePilot Water Solutions Permianllc
Production reportsnone
Latest permitRBJ & Associates, LPSep 7, 2016

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,100
total depth, ft
1
permits on file
Sep 7, 2016
last permit issued
Jun 17, 2023
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2016 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 17, 2023
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Orla North SWD O-10-48176Red Bluff (Consolidated)Pilot Water Solutions Permianllc200Nov 2016 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
818287-99DrillRBJ & Associates, LPSep 6, 2016Sep 7, 2016Sep 30, 20166,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-48176————

Formation tops

As filed on W-2/G-1. Subsea from 2,885 ft elevation.Download CSV →

FormationMD ftSubsea
DelawareFORD-DELAWARE3,900-1,015
CastileCASTILLE4,700-1,815
Bell Canyon6,000-3,115
Bone SpringBONE SPRINGS——
Cherry Canyon——
Delaware——
DelawareDELAWARE CONSOLIDATED GAS——
Pennsylvanian——
Permian (undifferentiated)PERMIAN——
Wolfcamp——

Perforations

Perforated and open-hole intervals.

FromToType
5,0036,100Perforated
5,0036,100Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37551117.5440 S
9.6255,00312.25825 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 21, 2024Jul 26, 2023—
00Mar 28, 2017Jan 10, 2017—
00Jan 30, 2017——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

6.73M
bbl, last 12 reported months
55.8M
bbl, all reported
Apr 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000113110W-14 DisposalActive35,0002,3004,600–6,100

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 6,726,291 · prior 12 7,782,609(-14%)

0500K1M20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/38935373, documented in the API reference.