WELL · 42-389-35445 · DISTRICT 8

Mendoza SWD #2

WaterY

Reeves County · Donahoo (Castile) field · Injection  · Vertical

Mendoza Swd #2 (API 42-389-35445) is a well in Reeves County operated by Waterbridge Texas Operating LLC, completed May 9, 2019 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued October 12, 2016, permitted to 7,200 ft.

It was permitted by High Sky Partners LLC and has since transferred to Waterbridge Texas Operating LLC on the wellbore schedule.

Completion filings report 8 formation tops, including Castile, Delaware, Bell Canyon, Cherry Canyon.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 4.69M barrels injected in the 12 months reported through April 2026.

Operator of record

Waterbridge Texas Operating LLC

Permitted by High Sky Partners LLC; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Apr 4, 2026 · 20 permits on file · (713) 454-7022

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWaterbridge Texas Operating LLC
Production reportsnone
Latest permitHigh Sky Partners LLCOct 12, 2016

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,200
total depth, ft
1
permits on file
Oct 12, 2016
last permit issued
May 9, 2019
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 9, 2019
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mendoza SWD O-10-43540Donahoo (Castile)Waterbridge Texas Operating LLC200Aug 2012 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
819167-99DrillHigh Sky Partners LLCOct 6, 2016Oct 12, 2016Nov 6, 20167,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-43540————

Formation tops

As filed on W-2/G-1. Subsea from 2,684 ft elevation.Download CSV →

FormationMD ftSubsea
CastileCASTILLE2,250434
Delaware4,292-1,608
Bell Canyon4,306-1,622
Cherry Canyon5,240-2,556
Bone SpringBONE SPRINGS——
DelawareDELAWARE CONSOLIDATED GAS——
DelawareFORD-DELAWARE——
Pennsylvanian——
Permian (undifferentiated)PERMIAN——
Wolfcamp——

Perforations

Perforated and open-hole intervals.

FromToType
4,5805,420Perforated
5,7256,150Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,97512.251,125 S
76,9908.75305 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 18, 2019Aug 13, 2019—
00Jun 20, 2017Apr 25, 2017—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

4.69M
bbl, last 12 reported months
50.4M
bbl, all reported
Apr 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000108695H-1 InjectionActive25,0002,0004,000–7,000

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 4,692,654 · prior 12 4,033,277(+16%)

0200K400K600K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/38935445, documented in the API reference.