WELL · 42-391-00767 · DISTRICT 2

Annie Reilly et Vir #6

N

Refugio County  · Vertical

Annie Reilly ET Vir #6 (API 42-391-00767) is a permitted well in Refugio County filed by Hilcorp Energy Company; no completion report is on file yet.

The RRC has issued 5 drilling permits between 2002 and 2014, permitted to 5,976 ft.

Completion filings report 4 formation tops, including Catahoula, Frio, Jackson, No Change.

Its 4 leases have reported 1.23M barrels of oil and 1.18M mcf of gas since January 1993, last reporting in July 2026. The leases carry 22 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitHilcorp Energy CompanyDec 15, 2014
5,976
total depth, ft
5
permits on file
Dec 15, 2014
last permit issued
—
completed
1.23M
cumulative oil, bbl
1.18M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 22 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Reilly, Annie, et Vir O-2-2588Tom Oconnor (5500 Sand)Hilcorp Energy Company151.07M997KJan 1993 – Jul 2026
Reilly, Annie, et Vir O-2-2592Tom Oconnor (4500 Greta Mass.)Hilcorp Energy Company5153K144KJan 1993 – Jul 2026
Annie Reilly et Vir G-2-255691Tom Oconnor (4800)Hilcorp Energy Company1033.1KMar 2010 – Dec 2014
Annie Reilly et Vir G-2-244753Tom O'CONNOR(4900)Hilcorp Energy Company109.6KDec 2008 – Mar 2010

Oil, barrels lease total

Last 12 months 6,641 · prior 12 7,093(-6%)

05001K202420252026

Gas, mcf lease total

Last 12 months 302 · prior 12 495(-39%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Quintana Pet. Corp.Jan 1993 → Nov 2000
  2. 2Hilcorp Energy CompanyDec 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
801663-99RecompletionHilcorp Energy CompanyDec 12, 2014Dec 15, 2014Dec 9, 20145,976
691117-99RecompletionHilcorp Energy CompanyFeb 10, 2010Feb 19, 2010Mar 2, 20105,976
675415-99RecompletionHilcorp Energy CompanyNov 21, 2008Nov 26, 2008Dec 4, 20085,976
556749-99RecompletionHilcorp Energy CompanyJan 25, 2005Feb 1, 2005—5,976
525979-99ReenterHilcorp Energy CompanyDec 2, 2002Dec 4, 2002—5,976

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-244753————
—— G-2-255691————
—— O-2-2588————
—— O-2-2592————

Formation tops

As filed on W-2/G-1. Subsea from 56 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula3,620-3,564
Frio4,330-4,274
JacksonJACKSON/YEGUA——
NO Change——

Perforations

Perforated and open-hole intervals.

FromToType
4,4104,416Perforated
4,7224,728Perforated
4,7364,746Perforated
4,7514,760Perforated
4,8104,820Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,02316350 S
9.6251,023—350 S
55,9748.75500 S
55,974—500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 22, 2018Feb 1, 2018—
00Jan 15, 2016Jul 29, 2015—
00Jul 5, 2010Mar 22, 2010Yes
00May 14, 2010——
00Mar 7, 2009Jan 2, 2009Yes
00Feb 7, 2009——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39100767, documented in the API reference.